Interesting. I hope that in a day or two at least the original 6 stalls will be back in operation while we wait for the utility to install the new transformer for the additional 18 stalls.
Charging now with full power. Looks like the original 6 stalls are on. The other 18 stalls are installed but not turned on. There are a total of 24 stalls.
Previous poster is wrong! Site is Not open. Had to back track to Bakersfield rolled in with 3 miles left. Talked to construction crew on site. Was told possibly tomorrow