I’m sure someone with more knowledge than me might able to figure it out but here is a few things that should be considered. Are there Power packs or any other battery storage systems on site? 1.44 MW is probably not a continuous approved load on a 1500 KVA transformer. There is a massive solar array on the roof of the structure (yes, I realize the date of manufacture on the sticker is after the panels were installed but it could be for future integration).