Exciting!!! The SCs are all closed up and look pretty much done! Looks like all they need to do is finish installing the fencing. Btw... Why is there fencing anyway?
Exciting!!! The SCs are all closed up and look pretty much done! Looks like all they need to do is finish installing the fencing. Btw... Why is there fencing anyway?
Looks like these are ready to go any day now. Fencing has been completed and the cones are gone. Looks like they striped the handicap stall today. Very fresh paint.
It's possible the utility transformer isn't in yet, I don't think we've seen a photo of that installed. It should go outside the structure, near the switchgear (white box behind fence in photos from post #56).