Funding now provided by NRCAN under Electtric Vehicle Alternative Fuels Deployment Initaitive Phase 2.
6623 Highway 16a West, Vegreville, AB (8 stations)
6623 Highway 16a West, Vegreville, AB (8 stations)
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature currently requires accessing the site using the built-in Safari browser.
Thanks for doing this! I may be headed that way in August and will see if there's appetite to do similarly (but I doubt it with kids in tow).Took a side trip to Vegreville yesterday to look around to see if any signs of construction starting. Poked around the Canadian Tire, Boston Pizza and WalMart parking lots and no signs yet of any Supercharger construction yet.
Should have said .... I think the concrete work and underground work was done. Wiring/power to be done, pedestals to be put up and then paving of the lot. So a few weeks yet maybe.Drove through Vegreville this afternoon. A crew of 6-8 people working on the supercharger. The Flo combo cabinets are both installed. The power and control wires were being pulled and connected to the Tesla transformer end. Making very good progress.