BrownOuttaSpec
Active Member
Dang! They have them mounted in the ground already! That was fast!Update: There Are 12 Stalls
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Dang! They have them mounted in the ground already! That was fast!Update: There Are 12 Stalls
Update: There Are 12 Stalls
Dang! They have them mounted in the ground already! That was fast!
I dunno man, might be soon. Isn't that a big green transformer in the background and the big wooden wire spools are empty so maybe the wires have already been run. Who really knows, it could be 99% done and just sit for 2 weeks like Mebane location did.They look almost complete because they are pre fab units (see earlier pics in this thread. That means the only work done so far is placing the pre fab units in position. They still need final wiring connection. Granted that is a lot less work than at a normal site but it still involves working with the local utility. So this site probably will not be active for awhile.
It looks finished to me.They look almost complete because they are pre fab units (see earlier pics in this thread. That means the only work done so far is placing the pre fab units in position. They still need final wiring connection. Granted that is a lot less work than at a normal site but it still involves working with the local utility. So this site probably will not be active for awhile.
Went by there yesterday, the fence is still upAnyone in the area to get us an update? It's been almost 2 weeks of looking almost ready. Still nothing on the official SuC map page or the in-car navigation but that is the same case for Garner, NC location and it is open and functional.
That large green box in the background your picture looks like it has a grey box with a glass part sticking out. Does that had a digital display with numbers on it, or is that not showing any power either? I feel like we are REALLY close to this place opening up.Power is still not on yet
I did not look at that sorryThat large green box in the background your picture looks like it has a grey box with a glass part sticking out. Does that had a digital display with numbers on it, or is that not showing any power either? I feel like we are REALLY close to this place opening up.
The meter has been set, but it was flashing all zeroes when I stopped there last Friday. Chargers were dead and not lit up. I may be going to Wilmington today so if I have time to stop I will look.That large green box in the background your picture looks like it has a grey box with a glass part sticking out. Does that had a digital display with numbers on it, or is that not showing any power either? I feel like we are REALLY close to this place opening up.
Yeah it’s across NC 24 from the Quality Inn where the old superchargers were. Rumors are that the hotel owner wasn’t happy hosting the supercharger and hence it was removed.Is this the Smithfield’s that I believe was across the street from the previous hotel location? Maybe there‘s one owner of the land?
The old Warsaw Supercharger location at the hotel was terrible. The owner/manager was a nut job. He would confront people who were charging telling them that Tesla hadn’t paid them rent, wouldn’t let people use the bathroom, etc. I heard horror stories.Yeah it’s across NC 24 from the Quality Inn where the old superchargers were. Rumors are that the hotel owner wasn’t happy hosting the supercharger and hence it was removed.