    The supercharger site in West Nyack, NY, is well underway. Near completion, perhaps. It is located in the Palisades Center parking lot parallel to Rt. 59 (across from Dunkin‘ Donuts), at the far end of the mall parking lot approximately across from The Cheesecake Factory. All of the kiosks appear to be installed at this point so it shouldn’t be long now.
     

    Attached Files:

    • Like x 9
    • Informative x 2
  2. Dypkny845

    Dypkny845 Member

    Joined:
    Oct 26, 2018
    Messages:
    44
    Location:
    NY
    i was just there last week scratching my head wondering why there were no chargers. Those are going to be some busy stalls.
     
  3. eladts

    eladts Member

    Joined:
    Jul 31, 2016
    Messages:
    372
    Location:
    Brookline, MA
    How many stalls are there? It is not entirely clear from the pics.
     
  4. mociaf9

    mociaf9 Member

    Joined:
    Oct 18, 2018
    Messages:
    902
    Location:
    CA
    Looks like the exact position is somewhere about HERE.

    The address of Palisades Center: 1000 Palisades Center Dr, West Nyack, NY 10994

    @BlueShift
     
  5. tanker5

    tanker5 Member

    Joined:
    Apr 21, 2015
    Messages:
    173
    Location:
    CT
    Nice!!! Excellent location!!
     
  6. Syd

    Syd Member

    Joined:
    Jul 13, 2015
    Messages:
    128
    Location:
    Philadelphia, PA
    before everyone declares victory, look for the transformer. If it's not there, its going to be a wait for the power company.
     
  7. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    32
    Location:
    Nyack, NY
    I’ll try to get better photos. The delivery trucks were blocking my view.
     
  8. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    32
    Location:
    Nyack, NY
    Are those not the white cabinets at the end? Based on number of cabinets and spacing of stalls to estimate the ones hidden behind the trucks, I estimate 20.
     
    • Informative x 1
  9. Syd

    Syd Member

    Joined:
    Jul 13, 2015
    Messages:
    128
    Location:
    Philadelphia, PA
    Transformer is not white cabinet. Transformer is usually green, and provided by power company. It's one box, or sometimes 3 pot-cans on the "telephone pole" (power pole).
     
  10. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    32
    Location:
    Nyack, NY
    These
     

    Attached Files:

    • Informative x 1
  11. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    32
    Location:
    Nyack, NY
    So I just drove alongside again and verified 20 stalls (supercharger.info: please update) and that the green transformer is installed.
     

    Attached Files:

    • Like x 4
    • Informative x 1
  12. Syd

    Syd Member

    Joined:
    Jul 13, 2015
    Messages:
    128
    Location:
    Philadelphia, PA
    Alas, I don't think those green boxes are a transformer. They are switchgear most likely. Transformer has heat sinks, and is usually low and squat.
     
    • Like x 2
  13. eladts

    eladts Member

    Joined:
    Jul 31, 2016
    Messages:
    372
    Location:
    Brookline, MA
    @BlueShift Please update the number of stalls to 20.
     
  14. NerdDoc

    NerdDoc Member

    Joined:
    Aug 18, 2015
    Messages:
    90
    Location:
    New Jersey
    This is great news. I live on the NY/NJ border and go there all the time. Heck, I used to work there on college break!
     
  15. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    32
    Location:
    Nyack, NY
    Update as of 12/13 9:00am:

    Looks like at least a few days still to go. They are currently moving down the row of stalls (about 1/3 done since yesterday), using a long orange contraption to run cabling from each kiosk to cabling previously laid parallel to the curb (which apparently runs to the white cabinets). They have already wired up the green distribution center cabinet to a concrete platform where the transformer will go (cables are just hanging out of conduits in the platform right now).
     
    • Informative x 1
  16. Mine GO BOOM

    Mine GO BOOM Member

    Joined:
    Jul 11, 2016
    Messages:
    25
    Location:
    Here
    Looking good, not operational yet.
     

    Attached Files:

    • Like x 4
    • Informative x 1
  17. ckoval7

    ckoval7 Mild One

    Joined:
    Sep 19, 2018
    Messages:
    331
    Location:
    Maryland
    Are they keeping the Tarrytown charger that's across the bridge?
     
  18. Dypkny845

    Dypkny845 Member

    Joined:
    Oct 26, 2018
    Messages:
    44
    Location:
    NY
    i wouldnt see why not. This should be for the Tesla shoppers. Ive once drove around the malls lot and counted the parked Telsa's (out of boredom waiting for the wife) and counted about 28 and im sure there was more.
     
    • Like x 1
  19. gutowskia

    gutowskia Member

    Joined:
    Dec 4, 2014
    Messages:
    58
    Location:
    Orangeburg, NY
    5CC1963E-8939-433E-8B39-63EB3772AA60.jpeg 85D3A5E6-3BD9-4B28-98A9-5BC79A9353D9.jpeg 979CE763-C9D0-4B5B-92DB-2B26D324B349.jpeg Looks like wiring is all in place. Still need the transformer and light posts. 10 of the 20 spots have signs “Tesla vehicle charging only” but the other 10 allow general parking with a 30 minute limit. That is confusing and could lead to abuse from our ICE car driving friends. Luckily these chargers are far away from the mall entry so the spots are not desirable for regular parking. Also the mall has an underground parking garage with lots of additional space. Parking is only an issue on the super busy holiday shopping days.
     
    • Like x 3
  20. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    32
    Location:
    Nyack, NY
    When I stopped by today, they were planting shrubs around the transformer and cabinet site for some camouflage. I guess everything will be ready to go once the transformer is finally in place. Anyone chat with a worker to ask if there’s an anticipated date?
     
    • Like x 3

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC