Supercharger - West Nyack, NY

Discussion in 'Mid-Atlantic' started by drgreenberg, Dec 10, 2018.

  1. CraZ8

    CraZ8 Member

    Joined:
    Apr 18, 2015
    Messages:
    297
    Location:
    Fort Montgomery NY
    Stopped by yesterday. Transformers are in but no lamp poles erected. Getting close!
     
    • Like x 1
  2. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    1,061
    Location:
    CA
    I don't think you're talking about the right thing. For longer than two months the major site hardware has been in and complete except for the utility transformer (big, dark green box; looks something like this). Is that what you saw? Because that's the transformer people have been commenting/asking about. We know the rest--the switchgear, autotransformers, and supercharger cabinets--has been in.
     
    • Informative x 1
  3. tanker5

    tanker5 Member

    Joined:
    Apr 21, 2015
    Messages:
    174
    Location:
    CT
    Some sites also use pole-mounted transformers.
     
    • Like x 1
  4. CraZ8

    CraZ8 Member

    Joined:
    Apr 18, 2015
    Messages:
    297
    Location:
    Fort Montgomery NY
    Did not see the utility transformer as I drove by on the access road next to the site. Just assumed it was behind the boxes/other hardware. I’ll be there tomorrow and look for the structure you posted.
     
  5. Galve2000

    Galve2000 Member

    Joined:
    May 20, 2013
    Messages:
    954
    Location:
    NYC
    I could have really used this SCer this weekend...
     
  6. CraZ8

    CraZ8 Member

    Joined:
    Apr 18, 2015
    Messages:
    297
    Location:
    Fort Montgomery NY
    BD40369F-EEA8-4CF0-A102-1A1D09BC0E18.jpeg 5C518165-BC0F-4156-8956-7279E8C0DA0C.jpeg Yes the big green transformers are in. Here are some pics. I felt sorry for a couple in a model 3 parked next to one looking confused. I hope they weren’t near 0
     
  7. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    1,061
    Location:
    CA
    That grey/green cabinet is the switchgear and the white ones are the supercharger cabinets. No transformers there.
     
    • Like x 1
  8. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    40
    Location:
    Nyack, NY
    The transformer pad is installed and visible from the access road and so you would have seen the transformer mounted there when you drove by. Everything in the photos was there back when I posted over 2 months ago now.
     
    • Helpful x 1
  9. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    40
    Location:
    Nyack, NY
  10. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    40
    Location:
    Nyack, NY
    Stopped by myself today and it’s in exactly the same state it’s been in for many weeks. Everything but the transformer, which is still missing.

    I do notice that there is significantly broken pavement in front of one of the end spots. I hope the mall patches the holes and doesn’t make us have to back over them to use that stall.
     
  11. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    40
    Location:
    Nyack, NY
    See the pic with my Dec. 11 post, 3 months ago. All the same cabinets already installed back then. No further electrical progress since.
     
  12. 3DM3

    3DM3 Member

    Joined:
    Nov 13, 2018
    Messages:
    9
    Location:
    NY
    I'm sure I will just waste my time but will make some calls locally to see if I can get an update. Have some friends and neighbors that seem to know everyone at O&R/mall, etc. Will let you know if I hear anything useful.
     
    • Like x 1
  13. Jennylabella

    Jennylabella New Member

    Joined:
    Mar 22, 2019
    Messages:
    1
    Location:
    New City
    Hello,
    I stopped by the West Nyack Supercharger today. They were paving the parking lot, hopefully it opens soon!
     

    Attached Files:

    • Informative x 1
    • Like x 1
  14. Loke88

    Loke88 Member

    Joined:
    Sep 2, 2017
    Messages:
    13
    Location:
    New York
    I got hold of Jonathan at utility co- O&R, he’s the new project manager, basically told me the same thing as in two months ago. The contractor rushed through the cabinet installation without having approval on the gas line that they back filled (asphalt). Safety issue there. Comes the good news part:

    Tesla was able to get O&R to use the alternative method to check the safety on the section where the contractor already filled with black asphalt to inspect how close the lines to the surface. It’s a Radar mapping line locator...Amen! Jon said this will take 2-3 weeks to complete. Then, if it’s all good, they will order the correct transformer unit to install. We are looking possibly end of summer, no definite date yet. That’s a step forward for all of us who are hawking over on these chargers.
     
    • Informative x 3
    • Like x 1
  15. CraZ8

    CraZ8 Member

    Joined:
    Apr 18, 2015
    Messages:
    297
    Location:
    Fort Montgomery NY
    If they have the all clear in 2/3 weeks to install the transformer shouldn’t they be up and running maybe a month or so later? Why 4/5 months?
     
  16. ckoval7

    ckoval7 Mild One

    Joined:
    Sep 19, 2018
    Messages:
    357
    Location:
    Maryland
    In a perfect world, yes. In reality, further inspections have to happen, the meter has to get installed, and the utility has to bless it, which they love to drag their feet on.
     
    • Helpful x 1
  17. mociaf9

    mociaf9 Active Member

    Joined:
    Oct 18, 2018
    Messages:
    1,061
    Location:
    CA
    Utility transformers of this size/type don't grow on trees. ;) Nor are they kept on hand in the local hardware store or electrical supply depot. It might not be delivered until 3+ months after ordering it. And the scheduling of the local utility work crews to then install and connect it is also a logistical constraint.
     
    • Informative x 1
    • Like x 1
  18. Galve2000

    Galve2000 Member

    Joined:
    May 20, 2013
    Messages:
    954
    Location:
    NYC
    I think the fact that this SCer location appeared out of nowhere nearly fully formed threw us all off. while it looked "cosmetically" ready, there seems to be a safety issue that needs to be solved before things will be a go. I hope it won't take months.. but at this point, it looks like we have no point but to wait.

    for my part, I happen to live on the east side of the Hudson, so Tarrytown SCer works just as well for me on my way up to -- or home from -- Nyack and other points on the west side of the Hudson. I only wish Tarrytown gave me better SCer speeds, but it is minor complaint.

    Tarrytown remains my go to SCer for "Sunday drives" tho lately I find myself in Brooklyn more often than not. I suspect this might change, once Spring time comes in full swing.. but that's still a few weeks away.
     
  19. gutowskia

    gutowskia Member

    Joined:
    Dec 4, 2014
    Messages:
    61
    Location:
    Orangeburg, NY
    The Tarrytown superchargers went live within days of completed work on the stalls, chargers and cabinets. Transformer over there is about 25 feet away from the chargers. The West Nyack Palisades Mall supercharger on the other hand is dragging big time. The designated transformer spot remains empty and hasn't changed in months. Thank you to those checking up on the utility and mall personnel.
     
    • Informative x 1
  20. drgreenberg

    drgreenberg Member

    Joined:
    Dec 10, 2018
    Messages:
    40
    Location:
    Nyack, NY
    I’m the opposite - I’m in Nyack and, while I like the Tarrytown site and having a nice restroom and Starbucks right there, I would love not having to pay the bridge toll or having to drive down to Paramus where I lose 7-8% charge just getting back home. Really looking forward to West Nyack but looks like we have another 5 months. That will make it 9 months from its first appearance to completion. Wonder if that’s a record?
     

Share This Page

  • About Us

    Formed in 2006, Tesla Motors Club (TMC) was the first independent online Tesla community. Today it remains the largest and most dynamic community of Tesla enthusiasts. Learn more.
  • Do you value your experience at TMC? Consider becoming a Supporting Member of Tesla Motors Club. As a thank you for your contribution, you'll get nearly no ads in the Community and Groups sections. Additional perks are available depending on the level of contribution. Please visit the Account Upgrades page for more details.


    SUPPORT TMC