Supercharging Progress

Discussion in 'Charging Standards and Infrastructure' started by jp158, Jun 17, 2013.

  1. jp158

    jp158 Member

    Joined:
    Dec 23, 2012
    Messages:
    47
    Location:
    Long Island, New York
    Wondering just how much progress Tesla has made to date with NEW supercharging stations?

    Does anyone know or have seen developments ?

    Thanks
     
  2. kcveins

    kcveins delivery 2/7

    Joined:
    Jul 24, 2012
    Messages:
    314
    Location:
    Chicagoland
    I checked the PLACES button on the NAV system this evening; still has the original West and East coast chargers; nothing else up yet...
     
  3. jp158

    jp158 Member

    Joined:
    Dec 23, 2012
    Messages:
    47
    Location:
    Long Island, New York
    yeah, Nothing I don't even see signs of new areas yet........ Hoping to see something soon! and his promises by fall are even greater!
     
  4. FlasherZ

    FlasherZ Sig Model S + Sig Model X + Model 3 Resv

    Joined:
    Jun 21, 2012
    Messages:
    7,019
    In the midwest thread we have pictures of the SC going into the parking garage in Normal, IL. The cabinets are mounted, the pedestals for the charging cables have been poured, and the cabling has been run. Likely another couple of weeks or so.
     
  5. NigelM

    NigelM Recovering Member

    Joined:
    Apr 3, 2011
    Messages:
    13,257
    Location:
    Sarasota, FL
  6. jp158

    jp158 Member

    Joined:
    Dec 23, 2012
    Messages:
    47
    Location:
    Long Island, New York
    This was sent regarding the question:

    There are 2 installations that will be up in Washington state by the middle of July. One in Burlington (pop ~ 8500) is currently under construction and then the same company (maybe even the same crew?) will install the one in Centralia (pop ~16,500).

    I would guess that there are many more currently under construction around the country. Expect an announcement when they are ready to be USED and not before (even though that has already happened).
    they are most certainly going in small cities/towns in Washington. In addition to Burlington and Centralia, the "dots on the map" show Ellensburg (pop ~ 18,500) and Moses Lake (pop ~ 21,000).
     
  7. PhilBa

    PhilBa Active Member

    Joined:
    Apr 20, 2013
    Messages:
    1,355
    Location:
    Seattle
    The Burlington, WA supercharger construction is well underway. Someone talked to the work crew and they said done by the end of June. The Centralia SC is at the "locate paint" stage and Ellensburg is a figment of Elon's fertile imagination.
     
  8. markb1

    markb1 Active Member

    Joined:
    Feb 17, 2012
    Messages:
    2,318
    Location:
    San Diego, CA
    It's surprising we only have construction sightings for a few of the new supercharger locations, at this point. Tesla only has 9 more days to make good on their statement that they will triple the number of superchargers by the end of the month. If that's really going to happen, most of the locations on the "Summer 2013" map need to be nearing completion as we speak. I'll be shocked (but pleased) if they really meet that goal.
     
  9. HansK

    HansK Member

    Joined:
    Feb 1, 2013
    Messages:
    47
    Location:
    La Canada Flintridge, California, United States
    Looks like the Buellton Supercharger is nearly complete:

    Work Location


    555 MCMURRAY RD
    BUELLTON CA 93427

    Permit Details

    [TR="class: ACA_FLeft"][/TR]
    Applicant:

    REID JOHNSON
    TESLA MOTORS, INC
    3500 DEER CREEK RD
    PALTO ALTO, CA, 94304
    Project Description:

    TESLA MOTORS CHARGING STATION
    INSTALL (8) CHARGING STATIONS FOR TESLA MOTORS LOCATED AT THE MARRIOTT HOTEL. CLEARANCES REQUIRED: BUILDING

    [TR="class: InspectionListRow"][/TR][TR="class: InspectionListRow"][/TR][TR="class: InspectionListRow"][/TR][TR="class: InspectionListRow"][/TR][TR="class: InspectionListRow"][/TR]
    Inspected Approved Below Floor Elec. (425674)
    Result by: Jim B Pierce on 06/13/2013 at 7:14 AM

    Inspected Approved Slab/Mesh Steel (425746)
    Result by: Jim B Pierce on 06/13/2013 at 7:15 AM


    Inspected Approved Ftg/Stl/Setback (425745)
    Result by: Jim B Pierce on 06/13/2013 at 7:15 AM


    Correction Notice Rough Electric (426100)
    Result by: Jim B Pierce on 06/19/2013 at 7:50 AM


    Correction Notice Final Electrical (426101)
    Result by: Jim B Pierce on 06/19/2013 at 7:50 AM
    [TR="class: InspectionListRow"][/TR][TR="class: InspectionListRow"][/TR]
    Inspected Approved Rough Electric (426205)
    Result by: Jim B Pierce on 06/20/2013 at 4:30 PM


    Inspected Approved Meter Release - Electric (426206)
    Result by: Jim B Pierce on 06/20/2013 at 4:30 PM
    Screen Shot 2013-06-22 at 12.52.50 AM.png
     
  10. Larry Chanin

    Larry Chanin Model S Perf Sig 1055

    Joined:
    Aug 22, 2011
    Messages:
    4,282
    Location:
    Sarasota, Florida
    The Normal Supercharger ribbon-cutting ceremony is scheduled for June 26th.

    Larry
     
  11. AlisoJames

    AlisoJames Member

    Joined:
    May 29, 2013
    Messages:
    65
    Location:
    Aliso Viejo, CA
    Unless our sleuths are missing something it sounds like there may be only 6 new ones open by the end of June (2 in CT, 2 in WA, 1 in IL and 1 in CA. Did I miss any? That would bring the total to 15 which is a long way off of 27.
     
  12. Cheerose

    Cheerose Member

    Joined:
    Mar 4, 2013
    Messages:
    161
    Location:
    Fort Lauderdale, FL
    #12 Cheerose, Jun 22, 2013
    Last edited: Jun 22, 2013
    Did Tesla say that Summer 2013 = end of June?

    EDIT: Never mind, I re-read their press release. My guess is that when they said "by the end of next month," they meant July, despite the press release coming out in May.
     
  13. Elshout

    Elshout Member

    Joined:
    Feb 3, 2013
    Messages:
    124
    Location:
    Novato
    Good work HansK. How did you get such detailed information? The Buellton Supercharger station will make our annual "Sideways" tour of Santa Barbara County wineries much easier.
     
  14. AlisoJames

    AlisoJames Member

    Joined:
    May 29, 2013
    Messages:
    65
    Location:
    Aliso Viejo, CA
    i wouldn't be surprised if you are right on that. Can't see how they bring another 12 online in the next week. But they should be able to by the end of July. Our trip is July 9-19 so we can hope that the one projected for Atascadero or Paso Robles gets installed by the middle of July.
     
  15. markb1

    markb1 Active Member

    Joined:
    Feb 17, 2012
    Messages:
    2,318
    Location:
    San Diego, CA
    Certainly one of the WA locations will not be ready in time. I think they can get away with adding just 16. You can make a case that there are only 8 open today, since one is split across northbound/southbound rest areas. But that still a lot more than have been spotted under construction.

    When you say "next month" on May 31, it means June. If they say they meant something else, they're revising history.
     
  16. PhilBa

    PhilBa Active Member

    Joined:
    Apr 20, 2013
    Messages:
    1,355
    Location:
    Seattle
    Well, the other WA supercharger (Burlington) may not be up by the end of next week (no wires or electronics sighted yet) so the delegation from the Great State of Washington may have to vote "Not Present".

    Let's face it, the whole supercharger announcement was a lot of wishful thinking on Elon's part. I'm glad he has the vision and am sure we will get there. But, I seriously doubt it will be anything like the promised timing..

    @Larry, I had to reread your post several times. I first wondered what a normal supercharger was. And, then wondered if there are abnormal ones? (I guess, in support of political correctness, that should be "special superchargers".) Maybe that's why ours in WA aren't done yet...
     
  17. AlisoJames

    AlisoJames Member

    Joined:
    May 29, 2013
    Messages:
    65
    Location:
    Aliso Viejo, CA
    What's the over/under on the total number of SC locations operational on June 30th? I think it is 15 (counting the ones already in place). That is a long way from 27.
     
  18. Larry Chanin

    Larry Chanin Model S Perf Sig 1055

    Joined:
    Aug 22, 2011
    Messages:
    4,282
    Location:
    Sarasota, Florida
    The Supercharger at Ft. Myers, Florida literally just broke ground, so it won't be ready before month-end.

    Larry


    attachment.php?attachmentid=24189&d=1371916507.jpg

    - - - Updated - - -

    Hi Phil,

    Cute. I guess I could have been more specific and said Normal, Illinois. :smile:

    Larry
     
  19. markb1

    markb1 Active Member

    Joined:
    Feb 17, 2012
    Messages:
    2,318
    Location:
    San Diego, CA
    Again, they can legitimately claim they tripled the number of supercharging stations if they add just 16, for a total of 24, if they count split northbound/southbound stations as one. Still a long way from that, counting the stations that have been spotted.
     
  20. goneskiian

    goneskiian Active Member

    Joined:
    Nov 16, 2012
    Messages:
    1,986
    Location:
    Bellevue WA
    Sent to whom?

    FYI, you're quoting me from a thread in the official Tesla Motors forums. ;)

    Sad to hear there hasn't been more progress in Burlington.

    As it has been pointed out, add about a month to any time quotes that come out of Elon's mouth and you'll be safe. Ha! ;)
     