TMC is an independent, primarily volunteer organization that relies on ad revenue to cover its operating costs. Please consider whitelisting TMC on your ad blocker or making a Paypal contribution here: paypal.me/SupportTMC

Tesla Annual Shareholder Meeting

Discussion in 'Australia & New Zealand' started by brewster, Jun 9, 2015.

  1. brewster

    brewster Member

    Joined:
    Sep 6, 2012
    Messages:
    354
    Location:
    Portland. Vic. Australia
    #1 brewster, Jun 9, 2015
    Last edited: Jun 9, 2015
    Tesla Annual Shareholder Meeting [Link]

    A couple of things of interest. My words are not very good here, but I hope you get the drift ...

    • Supercharger - now trialing a liquid cooled cable between car and supercharger allows greater flexibility and potential for greater energy transfer. [23:30]
    • Power walls now twice the continuous peak output (thanks ecarfan) for the same cost [From 2kW steady and 3.3kW peak - to 5kW steady and 7kW peak]
    • 1 billionth mile travelled
    • Gigafactory Phase 1 operational by middle of next year

    http://www.teslamotors.com/2015shareholdermeeting
     
  2. ecarfan

    ecarfan Well-Known Member

    Joined:
    Sep 21, 2013
    Messages:
    10,402
    Location:
    San Mateo, CA
    I have to watch the meeting video again, but I believe the change to the PowerWall products is that their continuous peak output is significantly increased: their overall capacity remains the same.
     
  3. brewstermac

    brewstermac Member

    Joined:
    Apr 24, 2015
    Messages:
    32
    Location:
    Portland, Vic, Australia
    You are correct. My power of recall is obviously not very good. Thanks for the correction.
     
  4. brewster

    brewster Member

    Joined:
    Sep 6, 2012
    Messages:
    354
    Location:
    Portland. Vic. Australia

Share This Page