airj1012
Active Member
My sister-in-law lives in Gallup, 140 miles from Albuquerque. Too far for a round trip without additional electrons! Last night we drove over to spread some Christmas cheer but due to the lack of any good information about the state of the Gallup SC, I was forced to getting our ICE car out of mothballs as I didn't want to spend 2+ hours at an RV park in the dark. Numerous articles both in the Albuquerque paper about the fact that the SC had been open since Wednesday, this forum's info and of course the appearing/disappearing dot on the Tesla SC web page convinced me that I didn't want to chance the SC being non operational. So when we went over I checked the SC and it appeared to be finished. The transformer was humming, the meter was in place, and no city permit stickers were visible and construction had long since finished. I still don't know if it works or not but maybe Tesla will, at some time, will let us in on the secret!
View attachment 39035
This is the information I got from Tesla yesterday - "Our Gallup site construction is complete, however we are still waiting on final inspections to energize the site. Please continue to monitor our website for updates." I imagine it'll be live next week.
- - - Updated - - -
Looks like if they add 3 more to the construction phase (Toledo OH, Washington DC and Brunswick GA) the route from Miami to NY to San Diego to Vancouver will be complete. New England must be feeling left out
Brunswick, GA? This is the first that I've heard of that location. Do you have any additional information to share about this possible location? Address or permit? Thanks.