These posts inspired me to do a little bit of digging, given we know the Solar Configurator was updated on February 11th. Some minor scoops for you all:
1. I've confirmed Standalone Powerwall sales are programmed into the new configurator. There is actually both with and without installation. I've found two documents, one called "standalone-pw-ship-to-home-tc" dated February 16, 2023, and one called "standalone-pw-direct-tc" dated January 13, 2023. Here's a snippet from "standalone-pw-ship-to-home-tc"
View attachment 908430
...
View attachment 908431
And here's a snippet from "standalone-pw-direct-tc":
View attachment 908438
2. Tesla has set up configurator URLs for 6 products. /commercial/design, /energy/design, /megapack/design, /powerwall/design, and most interestingly /unified/design . All URLs except /unified/design exist and work, but /powerwall/design redirects to /energy/design for the moment. No clue what the unified configurator might be, but it could match one of the titles belo