Detailed timeline:
3/1 Solar Planel Order
3/1 Design published & accepted
3/2 Alerted virtual notary unavailable in my area
3/25 Received docs to be notarized via email (was supposed to be mailed)
4/1 Label to send back emailed, package mailed
4/26 Permit issued
4/28 Asked about adding PWs, added to order, swapped to 1% 5yr financing
5/4 Install Scheduled for 5/7
5/6 Install canceled, home assessment scheduled for 5/13
5/13 Home assessment completed, no roadblocks
5/14 Install scheduled for 5/27
5/27 Installed
5/28 Informed can't inspect, need to redo permit to add powerwalls
6/7 Powerwalls added to Permit, Inspection scheduled for 6/9
6/9 Inspection- Failed, missing sticker(s)
6/11 Tesla tech came out, no idea what sticker is missing, added a bunch of stickers, emailed pics to the office
3/1 Solar Planel Order
3/1 Design published & accepted
3/2 Alerted virtual notary unavailable in my area
3/25 Received docs to be notarized via email (was supposed to be mailed)
4/1 Label to send back emailed, package mailed
4/26 Permit issued
4/28 Asked about adding PWs, added to order, swapped to 1% 5yr financing
5/4 Install Scheduled for 5/7
5/6 Install canceled, home assessment scheduled for 5/13
5/13 Home assessment completed, no roadblocks
5/14 Install scheduled for 5/27
5/27 Installed
5/28 Informed can't inspect, need to redo permit to add powerwalls
6/7 Powerwalls added to Permit, Inspection scheduled for 6/9
6/9 Inspection- Failed, missing sticker(s)
6/11 Tesla tech came out, no idea what sticker is missing, added a bunch of stickers, emailed pics to the office