You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
So I initially did single-motor because I was originally going to get the Y for the extra seats on occasion and the occasional need to haul something large. The cybertruck will do both better, however I'm starting to really eyeball that longer range. But now I'm worried about losing place in line, so how solid is that idea of waiting for configuration date and changing it then rather than changing the reservation?
Once they shifted build sequence an awful lot of people switched from dual to tri. I don't think those numbers reflect that.Assuming a mix based on the reservation tracker @550K potential orders:
220K Tri-motor (40%)
275K Dual (50%)
55K Single (10%)
It was about 18 months or so for the US buyer backlog to clear but the Model 3 ramp up was pretty slow. Considering there will be a decent number of reservation holders that will back out, a faster ramp up, and the fact that you are a current Tesla owner I would think you'd have yours within 6 to 9 months after production starts.Ordered a tri-motor for my wife last weekend. Was trying to get her into a Y, and she said she wanted a cybertruck instead. Love her.
How long did it take Tesla to get through it's backlog of Model 3 reservations? When I ordered mine it was after the reservation backlog had been cleared I guess.
It was about 18 months or so for the US buyer backlog to clear but the Model 3 ramp up was pretty slow. Considering there will be a decent number of reservation holders that will back out, a faster ramp up, and the fact that you are a current Tesla owner I would think you'd have yours within 6 to 9 months after production starts.
Ok maybe a dumb question... Will all tri-motor's and dual's be built first or is tri first then all the dual's? I have read it both ways.
Is there any proof exactly how the order and production line will be or is this just based off other models and how they were done?
I have a early reservation number first 20-30 minutes.
They haven’t even decided where to build the factory yet.Will all tri-motor's and dual's be built first or is tri first then all the dual's?
Ok maybe a dumb question... Will all tri-motor's and dual's be built first or is tri first then all the dual's? I have read it both ways.
Is there any proof exactly how the order and production line will be or is this just based off other models and how they were done?
I have a early reservation number first 20-30 minutes.