Please update as you see fit - but also note a comment in thread so that those that receive notifications are sent an email.

UK (scroll to end for Ireland)​

Map references

Supercharge.info map - Detailed site location information for existing and upcoming Superchargers for which there is firm evidence (planning or construction). Click on markers for detailed site information; for recent updates refer to the Changes tab.

Get notifications on supercharger.info’s UK changes via https://twitter.com/supercharge_uk (turn on feed alerts) - thanks to @scottrobertson

TOUK Google map - Existing and upcoming Superchargers accurate to postcode level plus additional layers for more speculative site locations.

Marker links in the tables below also reference Tesla's map. Note that this is not the same as the in-car navigation database and has some errors and omissions. The crowdsourced Supercharge.info map is generally more accurate.

PlugShare’s supercharger list - Tesla and PlugShare have a unique partnership and all Supercharger locations are locked against edits. Locations in construction are usually ‘hidden’ until Tesla asks for them to be public. It is not unusual for locations to appear ‘live’ on PlugShare a few days before Tesla’s own site has been updated.

Planning authorities for Motorway Service Areas (MSAs) - a list of local authorities responsible for authorising planning applications relevant to each service area. These can be used as a way to researching the history or new plans at a service area.

Annual summary archive posts

2021 summary: UK and Ireland Supercharger Site News - 2021 Archive
2022 summary: UK and Ireland Supercharger Site News - 2022 Archive
2023 summary: UK and Ireland Supercharger Site News - 2023 Archive

Sites opened in 2024

Date openedSupercharger (Tesla marker)Supercharge.info
map reference
Target openingLocation (target marker location comments) & notesRef.
09/01/24London, UK - BromleyBromley, UKQ1 2024 (on schedule*)Bromley Civic Centre car park, Stockwell Close.
Tesla map marker added April 2022, adjacent to The Glades shopping centre. *Target date changes: Q3 2022 to Q2 2023 (August 2022); Q1 2024 (February 2023).
[12 x V4 250 kW]
#6,946
(09/01/24)
15/01/24Gatwick, UK - Gridserve Electric ForecourtGatwick - Gridserve Electric Forecourt, UKNot previously listedGridserve Gatwick Electric Forecourt next to Mariott Hotel, Gatwick Airport.
[4 x V3 250 kW]
#6,994
(15/01/24)
07/02/24Medway, UK - EastboundMedway - Eastbound, UKQ3 2023 (behind schedule)Moto M2 Medway Eastbound Services.
Tesla Medway Eastbound map marker added February 2023, on westbound side of motorway.
[12 x V3 250 kW]
8 of 12 stalls commissioned initially; remaining 4 under covers.
#7,041
(07/02/24)
08/02/24Medway, UK - WestboundMedway - Westbound, UKQ3 2023 (behind schedule*)Moto M2 Medway Westbound Services.
*Tesla Rainham became Medway Westbound. Map marker added November 2022 in notional town centre location in Rainham. Target date change: Q4 to Q3 2023 (February 2023).
[12 x V3 250 kW]
#7,041
(07/02/24)
10/02/24Kettering, UKKettering, UKNot previously listed*Barton Hall Hotel, Kettering.
*Former Tesla map marker located nearby at Kettering retail park, target date Q3 2022, removed in August 2022.
[8 x V4 250 kW]
#7,056
(10/02/24)
12/02/24Ipswich, UKIpswich, UKQ4 2023 (behind schedule)Anglia Retail park, Ipswich (A14 Jct 53).
Original planning application was for 20 stalls in two phases (12 plus infrastructure initially + 8 additional stalls in second phase).
Tesla map marker added August 2022 at site location. Target date change: Q1 2023 to Q4 2023 (February 2023).
[12 x V4 250 kW]
#7,070
(12/02/24)
14/03/24Frankley, UK - SouthboundFrankley - Southbound, UK2024
(on schedule*)
Moto M5 Frankley Southbound Services.
Tesla map marker added February 2023 at site location. *Target date change: Q3 2023 to 2024 (March 2024)
[16 x V4 250 kW]
#7,167
(14/03/24)

Sites expanded/upgraded/relocated in 2024

Date change effectiveSuperchargerPrevious SpecNew SpecRef.
28/02/24Birchanger Green, UK4 x V2 150 kW4 x V2 150 kW + 20 x V3 250 kW
V2 stalls retained in original location near Days Inn; 20 V3 stalls, including 4 with a pull-through layout, added in main carpark near Starbucks (about 200 m away).
#7,122
(29/02/24)
15/03/24Hopwood Park, UK16 x V2 150 kW16 x V2 150 kW + 20 x V3 250 kW
V2 stalls retained; additional V3 stalls added alongside
#7,175
(15/03/24)


Upcoming Sites from Tesla.com/permits/construction/awaiting commission


The tables below list sites under construction and proposed sites with markers on Tesla's map, sorted by Tesla's Target Opening date. Historically, marker information has been approximate in terms of both location and timing and many markers end up being removed. Tesla periodically update target site information; the most recent major updates were in February 2023 and March 2024 (follow links for a summary of the changes).

Additional sites not on Tesla's list are also included: if construction has started they are listed in the first table below, other sites (typically where planning requests have been submitted) are listed separately at the end.

Tesla have a separate list of proposed Service Centres on their website (Tesla Service Centers [sic] in United Kingdom), many of which end up with Superchargers. These are included as additional sites if they are not captured by Tesla's proposed Supercharger list but there is evidence (planning or construction) of Superchargers being installed.

Links in the Supercharge.info Marker column open the supercharge.info map centred on the site location marker. Click the marker for more information.

Under Construction​

Tesla MarkerSupercharge.info MarkerTarget OpeningPlans/PermitNotesRef.
AbingtonAbingtonTBCExpansionUnder construction: area fenced off and contractors on site as of 12/03/24. Number and type of stalls TBC (10 estimated, presumed to be V3).#7,155
(13/03/24)
#7,172
(14/03/24)
AnnesleyMour HotelTBC*Under construction: 10 x V4 stalls in place as of 29/02/24, at Mour Hotel, Annesley, near M1 Jct 27.
*Rumoured to be opening on 12/03/24.
#7,123
(29/02/24)
BirchMoto Birch Eastbound2024Under construction: 12 x V3 at Moto Birch Eastbound (M62) services.
12x V3 stalls assumed (24 total quoted for eastbound plus westbound services). Tesla contractor on site as of 21/05/23; three charger cabinets delivered to site and stall foundations under construction as of 16/06/23.
Tesla map marker reinstated in April 2022. See also Birch Westbound (Middleton), below. Target date changes: Q3 2022 to Q1 2023 (August 2022); Q3 2023 (February 2023); 2024 (March 2024).
#5,876
(21/05/23)
#6,010
(16/06/23)
Birch Westbound
(Middleton)
Moto Birch WestboundQ4 2023*Rochdale Council
[Grant subject to conditions
02/09/20]
Under construction: Foundations for 12x V3 stalls constructed as of 28/05/23 (24 total quoted for eastbound and westbound; 10x V3 and 6 Ecotricity on plans). Initial groundworks (for third party chargers) commenced at the start of October 2021; Tesla contractor on site as of 21/05/23.
In Jan 2021 Tesla had two Birch markers with identical locations midway between the separate eastbound/westbound service areas; one marker was removed in April 2021 & reinstated in April 2022 (see Birch Eastbound). Target date changes: Q2 to Q3 2021 (April 2021); Q3 to Q4 2021 (August 2021); marker removed 03-Feb-22, reinstated April 2022 (target opening Q3 2022), removed again in August 2022. *Marker reinstated November 2022 (target opening Q4 2023); removed again on/before May 2023.
#1,582
(29/07/21)
#3,668
(08/10/21)
#5,876
(21/05/23)
#5,894
(28/05/23)
Bristol EastvilleBristol - EastvilleQ3 2024Under construction: 8 x V3/V4 (TBC) at Eastgate retail park. Stall foundations in place as of 15/01/24.
Tesla map marker added August 2022 in apparently notional location on Bath Road/Keynsham bypass. Originally labelled Bristol East.
Target date change: Q1 2023 to Q3 2024 (February 2023)
#6,993
(16/01/24)
Exeter Service CentreExeter Service CentreTBCExeter Council Ref 22/0469/FUL & 23/0473/ADV
[Granted 21/10/22]
Under construction: 12 x V3/V4 (TBC) at new Tesla service centre. Stall foundations in place and tarmac laid as of 20-Aug-23.
Planning drawings include 12 supercharger stalls under a canopy plus a substation and three charging cabinets (not part of planning application scope).
#5,822
(01/05/23)
#6,270
(20/08/23)
FraddonKingsley Village Retail ParkTBCAwaiting final commissioning: 8 x V4 at Kingsley Village Retail Park, Cornwall, TR9 6NA. Equipment on site as of 25/07/23. Stalls and charger cabinets in place, under covers, as of 05/10/23.
Investment summary document indicates 10 year lease arrangement with Tesla in place.
#6,194
(26/07/23)
#6,365
(04/09/23)
#6,508
(05/10/23)
Gloucester - NorthboundGloucester M5 Northbound ServicesTBCUnder construction: 8 x V4 at motorway service area. Stall and charger cabinets foundations in place as of 13/03/24.#7,159
(13/03/24)
Gloucester - SouthboundGloucester M5 Southbound ServicesTBCUnder construction: photos appear to show two charger cabinets and 8 stall bases delivered to site (fenced off area of car park) as of 26/02/24.#7,114
(26/02/24)
Gretna GreenGretna Green, UKTBCExpansionAwaiting final commissioning: 14 x V3 stalls replacing previous 4 x V2 ones. New stalls, plus 4 charger cabinets, in place (site temporarily offline) as of 13/02/24. Groundworks for additional 11 x V3 stalls alongside old V2 stalls completed by mid Jan 2024. Groundworks commenced as of 23/11/23 and stall foundations in place as of 15/12/23, adjacent to existing V2 stalls. Four charger cabinet bases also constructed.#6,826
(15/12/23)
#7,005
(23/01/24)
Hamilton (Larkhall)Radstone HotelQ1 2024South Lanarkshire Council
Ref P/23/0575
[Approved 14/06/23]
Under construction: stall foundations being built as of 16/09/23.
16 x V4 supercharger stalls shown on planning application for site at Radstone Hotel, just off M74 Jct 8.
Tesla map marker added February 2023 just south of Larkhall on M74 near Jct 8.
#6,006
(16/06/23)
#6,420
(18/09/23)
Old Trafford
(Manchester - White City)
Manchester - White City Retail Park2024Awaiting final commissioning: 16 x V3 at White City Retail Park in Old Trafford. Four charging cabinets in place as of 10/05/23, stalls in place as of 21/05/23.
Original site page was titled "Manchester, UK - White City".
Tesla map marker added November 2022 adjacent to White City retail park. Target date change: Q3 2023 to 2024 (March 2024).
#5,852
(11/05/23)
#5,875
(21/05/23)
Milton Keynes Service CentreMilton Keynes Service CentreTBCMilton Keynes Council
23/00676/ADV
[Permitted 15/05/23]
Under construction as of 26/01/24 according to Supercharge.info.
8x V3 chargers shown on site plans for Milton Keynes Service Centre planning application at Merton Drive, Redmoor.
Former Tesla map marker added in January 2021.
Target date changes: Q2 to Q3 2021 (April 2021) then to 2022 (August 2021). Marker removed in April 2022.
#5,714
(30/03/23)
Preston - SouthHoliday Inn Express Preston SouthQ1 2024Under construction: 15 stall bases counted in car park of Preston South Holiday Inn Express, Bamber Bridge (M6 Jct 29).
Tesla map marker added February 2023.
#6,494
(02/10/23)
#6,601
(31/10/23)
SheffieldMeadowhall Retail Park2024Sheffield City Council
Ref 22/02963/FUL
[Grant Conditionally 07/12/22]
Awaiting final commissioning: 12 x V3 superchargers plus 6 Pod Point bays shown on planning drawings for Meadowhall Retail Park EV charging application (just down the road from the shopping centre). Groundworks commenced 05/07/23, tombstones in place 18/07/23.
Tesla map marker added April 2022 located at Meadowhall shopping centre. Target date changes: Q3 2022 to Q1 2023 (August 2022); Q3 2023 (February 2023); 2024 (March 2024).
#5,061
(11/10/22)
#6,086
(05/07/23)
#6,172
(18/07/23)
SolihullSolihull Service CentreQ1 2024Solihull Metropolitan Borough Council
Ref PL/2023/00383/CLOPUD
[Approved 21/04/23]
Under construction. 6 x V3 supercharger stalls shown on proposed site plans for Blythe Valley Park development. Foundations for superchargers being laid as of 06/12/23.
Tesla map marker added February 2023 in nearby location.
#5,823
(03/05/23)
#6801
(06/12/23)
South MimmsSouth Mimms, UKTBCExpansionUnder construction: 24 x V3 additional stalls (TBC). Equipment on site as of 09/12/23 appears to include 6 charger cabinets and 24 V3 supercharger stalls. Foundations for at least 17 stalls in place as of 04/01/24.#6,804
(09/12/23)
#6,918
(04/01/24)
ThetfordThetford, UKTBCExpansionUnder construction: V2/V3 stalls being replaced with V4.
Initially an additional 8 x V3 250 kW stalls were installed opposite existing 8 x V2 150 kW stalls. Original groundworks looked complete as of 18/06/22 but commissioning reportedly delayed by power supply issue. All stalls subsequently removed in March 2024 in preparation for upgrade to V4.
#4,397
(29/03/22)
#4,455
(10/04/22)
#4,733
(18/06/22)
#7,139
(06/03/24)


"Coming Soon™" (On Tesla's Map)​

Tesla MarkerSupercharge.info MarkerTarget OpeningPlans/PermitNotesRef.
GuildfordGuildford Service CentreQ3 2023Tesla map marker in an apparently notional town centre location.
x8 Superchargers planned for Guildford Service Centre according to a local source. Timing depends on power arrangements.
Tesla map marker added February 2022. Target date changes: Q2 to Q3 2022 (April 2022); Q1 2023 (August 2022); Q3 2023 (February 2023).
#3187 (26/05/21)
Washington NQ4 2023Moto service area on A1(M).
Tesla map marker spotted October 2023 but could have been added earlier in the year.
BridportQ1 2024Tesla map marker added February 2023 at The Crown Roundabout near Groves Nurseries in Bridport.
GodstoneQ1 2024Tesla map marker added February 2023 at the A22/A25 roundabout east of Godstone. Service centre marker also shown for this location.
Portsmouth - WestPort Solent Car ParkQ1 2024Portsmouth City Council
Ref 23/00732/FUL
[Submitted 13/06/23]
12 x V4 supercharger stalls plus 8 destination chargers shown on planning application for Port Solent car park, just off M27 Jct 12.
Tesla map marker added August 2022, located at (and initially named after) Port Solent marina. Target date change: Q1 2023 to Q1 2024 (February 2023).
#6,058
(29/06/23)
SwindonSwindon Designer OutletQ1 2024Swindon Borough Council
Ref S/23/0775
[Submitted 19/06/23]
16 x V4 supercharger stalls (plus 20 x 22kW fast chargers) proposed for Swindon Designer Outlet Car Park North.
Tesla map marker in town centre added February 2022. Moved in April 2022 to a location adjacent to Swindon Designer Outlet. Target date changes: Q3 2022 to Q1 2023 (August 2022); Q1 2024 (February 2023).
#6,201
(27/07/23)
TauntonQ1 2024Marker is east of the town, about 2 miles east of M5 Jct 25. Target date changes: Q4 2021 to 2022 (August 2021); Q3 2022 (April 2022); Q1 2023 (August 2022); Q1 2024 (February 2023).
CannockQ2 2024Tesla map marker added August 2022 in an apparently notional town centre location.
Target date change: Q1 2023 to Q2 2024 (February 2023).
PlymouthQ3 2024Marker location looks notional: in the middle of the city area on the Manadon Roundabout. See also Gridserve Plymouth Centre in table below which is thought to be a separate site. Target date changes: Q3 to Q4 2021 (September 2021); Q2 2022 (February 2022); Q3 2022 (April 2022); Q1 2023 (August 2022); Q3 2024 (February 2023).
Brighton (305252)Q4 2024Tesla map marker added October 2022, in identical location to existing Brighton marker (see below) but with more specific target date.
Target date change: Q4 2023 to Q4 2024 (February 2023).
Bangor2024Tesla map marker added July 2023 (Q2 2023 Supercharger Voting Winner) in notional town centre location.#6,138
(13/07/23)
Bar HillBar Hill (SC)2024Greater Cambridge Shared Planning
Ref 23/00798/FUL
[Granted, subject to conditions, 06/07/23]
12x V3 supercharger stalls shown on layout plan included with planning application for proposed Service Centre at Bar Hill, NW of Cambridge (A14 Jct 25).
Tesla map marker added February 2023, near Cambridge Airport (about 10 miles from Bar Hill). Target date change: Q1 2024 to 2024 (March 2024).
#5,642
(11/03/23)
#6,948
(10/01/24)
Bournemouth2024Tesla map marker added in March 2024. May be connected to Bournemouth Service Centre or Ferndown Golf Club (see table below)
Brora2024Tesla map marker added April 2022, at Brora Golf Club just off the A9 in northern Scotland (but may be a notional location). Target date changes: Q4 2022 to Q1 2023 (August 2022); Q4 2023 (February 2023); 2024 (March 2024).
Cardiff2024Former Tesla map marker, at M4 Jct 32 (Coryton), added August 2022 with Q1 2023 target date, removed in February 2023. Marker reinstated in March 2024.
FavershamMacknade Farm Shop2024Swale Borough Council
Ref 23/505424/FULL
[Submitted 28/11/23]
16 x V4 supercharger stalls shown on planning application at Macknade Food Hall, Faversham, just off A2 near M2 Jct 7.
Former Tesla Faversham map marker added February 2022, target Q2 2023, removed in February 2023. Marker reinstated in March 2024 with 2024 target date.
#6,989
(15/01/24)
GlasgowGlasgow Service Centre2024Glasgow Council
[“Grant Subject to Condition(s)” - 29/09/20]
x8 supercharger stalls shown on service centre site plans. Reportedly delayed until sufficient power can be supplied to site.
Groundworks underway 27/11/23, reportedly for 5 stalls (TBC).
Tesla map marker added in April 2022. Target date changes: Q3 to Q4 2022 (August 2022); Q4 2023 (February 2023); 2024 (March 2024).
#1653 &
#2565 (11/12/20)
#6,772
(29/11/23)
GretnaGretna - Caledonia Park2024Dumfries and Galloway Council Ref 23/1025/CLP
[Submitted 18/05/23]
16 x V4 supercharger stalls shown on planning application documents for a site at Caledonia Park, Glasgow Road, Gretna, just off the A74 (M).
Tesla map marker (original labelled "Gretna - Caledonia Park") added February 2023 close to proposed location. Target date change: Q1 2023 to 2024 (March 2024).
#5,903
(31/05/23)
Hull2024Tesla map marker added October 2023 (Q3 2023 Supercharger Voting Winner - bonus site) at St Andrews Quay Retail Park.#6,582
(27/10/23)
Kingston Upon Thames2024Tesla map marker added February 2023, in notional location west of town centre. Target date change: Q4 2023 to 2024 (March 2024).
Liverpool2024Tesla map marker added in March 2024.
Peterborough2024Tesla map marker added January 2024 (Q4 2023 Supercharger Voting Winner - bonus site) at notional location on south side of city.#6,953
(12/01/23)
Polmont2024Tesla map marker added February 2023, in notional location near Junction 5 of the M9. Target date change: Q4 2023 to 2024 (March 2024).
Tamworth2024Moto service area. Groundworks for "electrical dual circuit installation works" adjacent to services commenced in February 2023.
Tesla map marker added August 2022 at Moto Tamworth services, M42 Jct 10. Target date changes: Q1 2023 to Q4 2023 (February 2023); 2024 (March 2024).
#5,528
(17/02/23)
Wimbledon2024Tesla map marker added April 2022, at the location of the Centre Court Shopping Centre. Target date changes: Q3 2022 to Q2 2023 (August 2022); 2024 (March 2024).
Stevenage2025Former Tesla map marker, at A1(M) Jct 7, added August 2022 with Q1 2023 target date, removed in February 2023. Marker reinstated in March 2024.
Thurso2025Tesla map marker added in March 2024 in notional location in town centre.
BrightonTBCA Brighton marker has existed for many years (in 2017-18 the target date was "by end 2018"). Many have dreamed only to see their hopes dashed: be wary of being seduced by unconfirmed rumours in this much longed-for location. A second nearby marker, removed in August 2022, labelled "Brighton Station" suggests a potential site location near the railway station. See also Brighton (305252), above.
Target date changed from 2022 to TBC in May/June 2022.
Liverpool EastTBCTesla map marker added February 2022 in Broadgreen area near M62 Jct4, close but separate to pre-existing Liverpool marker (removed in April 2022). Target date changed from Q2 2021 to TBC in April 2022.

Other Proposed Superchargers (Not On Tesla's Map)​

LocationSupercharge.info MarkerTarget OpeningPlans/PermitNotesRef.
BromboroughGridserve BromboroughTBCWirral Council
Ref APP/21/01568
["Approve" - 09/02/22]
x8 “Branded chargers”, likely superchargers [Not on Tesla map]
Gridserve plans also shown on their Bromborough web page.
#3,486 (12/08/21)
GatesheadGridserve GatesheadTBCGateshead Council
[“Granted”- 30/04/21]
x4 “Branded chargers”, likely superchargers [Not on Tesla map]#2609 (23/12/20)
HartlepoolGridserve HartlepoolTBCHartlepool Council
Ref H/2021/0404
[Environmental Impact Assessment Scoping]
x4 “Branded chargers”, likely superchargers [Not on Tesla map]
Gridserve plans also shown on their Hartlepool web page.
#5,056
(10/10/22)
NevendonGridserve NevendonTBCBasildon Council
Ref 21/01515/FULL
["Awaiting Decision"]
x4 "Branded chargers" (Tesla supercharger stalls are shown in the proposed visuals submitted with the planning application in October 2021). Gridserve provide more information on their Nevendon web page (Aug 2021). [Not on Tesla map].#3,508 (16/08/21)
Plymouth CentreGridserve PlymouthTBCPlymouth Council
Ref 21/01696/FUL
["Grant Conditionally" 03/12/21]
x4 “Branded chargers”, likely superchargers [Not on Tesla Map].
Assumed to be additional to Tesla's marker (see Plymouth, above).
#3298 (14/06/21)
RutherglenGridserve RutherglenTBCTBCGridserve indicate their intention to submit a planning application on their Glasgow Rutherglen web page (May 2023) including space for x4 "branded chargers", likely Superchargers.#5,842
(09/05/23)
StevenageGridserve StevenageTBCStevenage Council
Ref 21/00536/FPM ["Granted" - 08/07/22]
x4 "Branded chargers", likely superchargers (original planning drawings showed 8, number reduced to for in subsequent amendment).#3124 (14/05/21)
#6,658
(10/11/23)
UckfieldGridserve UckfieldTBCWealdon Council
[“Approval” - 16/03/21]
x8 “Branded chargers”, likely superchargers.#2,533 (07/12/20)
#2,797
(04/03/21)
YeovilGridserve YeovilTBCTBCGridserve indicate their intention to submit a planning application on their Yeovil web page (Oct 2021) including space for x4 "branded chargers", likely superchargers.#3,696 (21/10/21)
Reading - EastboundMoto Reading Eastbound ServicesTBCWest Berkshire Council
Ref 23/02937/FUL
[Received 21/01/24]
Planning application for a 16 stall V4 supercharger in two phases: 6 + 10. Second phase supported by Megapack battery storage.#7,092
(22/02/24)
RownhamsRoadchef Rownhams Northbound ServicesTBC*Test Valley Council
[Granted 16/04/21]
Update with canopy:
22/00430/FULLS
[Granted 24/03/22]
12x V3 and 12 Gridserve units in planning application. Additional planning for canopy approved March 2022.
Subsequent planning application for service building redevelopment in February 2024 casts doubt on project: only 6 charging bays (3 Tesla) are indicated on planning drawings.
Groundworks underway in proposed supercharger location as of 18/03/23 but no Tesla equipment on site.
*Former Tesla map marker added in January 2021. Target date changes: Q2 to Q3 (April 2021); Q3 to Q4 (August 2021). Marker removed from map 03/02/22.
#6,545
(18/03/23)
#7,115
(27/02/24)
StaffordMoto Stafford Northbound ServicesTBCStafford Council 20/32527/FUL
[Granted 29/10/20]
x12 Superchargers [Not on Tesla map]
Planning expired on 29/10/23.
#2,739 (12/02/21)
WetherbyMoto Wetherby ServicesTBCHarrogate Council
[Application Permitted 24/11/21]
x12 Superchargers inferred from plans (same layout as other joint Gridserve/Tesla developments). Screening application for expansion to 66 stalls made in October 2023.
Groundworks underway as of 02/12/21 for power suppl
y installation; an array of new Gridserve rapid chargers live as of 14/07/22 but no Tesla equipment yet spotted on site.
#3,854 (05/12/21)
#4,817
(15/07/22)
#6,581
(26/10/23)
Winchester NorthboundMoto Winchester Northbound ServicesTBCWinchester City Council Ref 22/02683/FUL
[Application Permitted 21/02/23]
Planning application for 12 supercharger stalls plus 12 Gridserve rapid chargers.
Former Tesla map marker added August 2022 (on southbound side), marker removed at start of 2023 and link disabled in February 2023.
#5,616
(06/03/23)
Winchester SouthboundMoto Winchester Southbound ServicesTBCWinchester City Council Ref 22/02730/FUL
[Application Permitted 21/02/23]
Planning application for 12 supercharger stalls plus 12 Gridserve rapid chargers.
Former Tesla map marker added August 2022, marker removed at start of 2023 and link disabled in February 2023.
#5,606
(05/03/23)
Annandale WaterRoadchef Annandale Water ServicesTBCDumfries & Galloway Council Ref 22/0907/FUL ["Grant Unconditionally" 12/08/22]x9 Tesla plus x10 Gridserve with (?solar) canopies shown on plans for A74(M) J16 service area. Groundworks for Gridserve rapids underway in May 2023.#4,830
(19/07/22)
#5,872
(19/05/23)
DurhamRoadchef Durham A1(M)TBCDurham County Council
Ref DM/22/00477/FPA
["Approved" - 20/05/22]
x12 Tesla superchargers + x12 Gridserve with solar canopies shown on plans for A1(M) J61 service area.
See also Bowburn, below.
#4,858
(29/07/22)
Bournemouth Service CentreFerndown Service CentreTBCDorset Council (for signage)
["Granted" 31/05/22]
8x V3 chargers shown on one of the Bournemouth Service Centre site plans in planning application.
Former Tesla Ferndown map marker added in January 2021 in location subsequently occupied by (now also removed) Bournemouth marker then moved to a position just off A31 north of Ferndown in April 2022 before being removed in August 2022. Target date changes: Q3 2021 to Q4 2021 (April 2021); Q2 2022 (February 2022); Q3 2022 (April 2022).
#2,660
(06/01/21)
#3,900
(21/12/21)
#4,069
(31/01/22)
Bristol - Centaurus RoadBristol (SC) , UKTBCSouth Gloucestershire Council
DOC22/00045
[Decided 15/11/22]
Eight supercharger stalls shown on planning drawings.#6,103
(08/07/23)
Lincoln Service CentreLincoln (SC), UKTBCNorth Kesteven District Council
Ref 23/1199/RESM
[Approved 18/01/24]
8 supercharger stalls shown on plans for service centre at Teal Park, off A46 in Hykeham.#7,081
(16/02/24)
Manchester - Ashton New RoadManchester - Ashton New Road Service CentreTBCManchester City Council
136498/AO/2023
[Approved 03/07/23]
Planning drawings include 12 supercharger stalls and 3 charger cabinets#6,104
(08/07/23)
Sheffield Service CentreSheffield Service CentreTBCSheffield City Council
22/02561/FUL
["Grant Conditionally" 05/09/22]
Planning drawings include 14 supercharger stalls but only two charging cabinets so final number and location TBC.#4,852
(27/07/22)
St AlbansSt Albans Service CentreTBC*St Albans Council
Ref 5/2023/2572
[Submitted 18/12/23]
12 x V4 supercharger stalls shown on planning documents for new service centre on Lyon Way, St Albans, AL4 0LQ.
*Tesla map marker, target date Q1 2024, added February 2023 at A1(M) Jct 3 (closer to Hatfield than St Albans); marker removed in March 2024.
#7,118
(27/02/24)
Barnsley - HaighThe Old Post Office, HaighTBCBarnsley Council
2023/0507
[Under consideration, 23/05/23]
Planning application for a 12 stall supercharger.#6,102
(08/07/23)
Blandford HillBlandford Hill Eco HubTBCDorset Council
Ref P/FUL/2021/02622
[“Granted” 26/01/22]
Tesla chargers mentioned on Naturalis Eco Hub development website although not explicitly indicated on planning drawings.#3,558 (02/09/21)
#4,126
(06/02/22)
BowburnBowburn, UKTBCDurham County Council
Ref DM/23/02606/RM
[Received 29/08/23]
Planning application for a 20 stall supercharger at Integra 61 development, south of Bowburn.
Close to Durham Roadchef services which also has a supercharger planning application.
#7,000
(21/01/24)
BradfordCedar Court HotelTBCBradford City Council
Ref 23/02778/FUL
[Granted 20/10/23]
Planning application for a 16 stall V4 supercharger.#6,322
(30/08/23)
BridgwaterBridgwater Gateway Business ParkTBCDeveloper plans ("detailed planning permission in place")Business park developer brochure includes a map showing space for Tesla Charging with 8 charging bays.
Possibly connected with a former 2021 Tesla marker in Bridgwater town centre (target Q2 2021 in January 2021; 2023 in April 2021; removed August 2021).
Note alternative rumours link the former marker to the Gravity business park development; an M5 Moto service area is also nearby.
#3436 (16/07/21)
#2696
(21/01/21)
#3,436
(16/0721)
Brierly HillBrierly Hill (Port West Retail Park)TBCDudley Council ref P15/1758/C2 [Approved 06/08/21]x12 supercharger stalls shown on site plan included with planning application for Port West Retail Park, Brierly Hill.#5,475
(08/02/23)
FerndownFerndown Forest Golf ClubTBCx8 stall supercharger reportedly being installed (mentioned in demo day advert).
Former Tesla Ferndown map marker added in January 2021 in location subsequently occupied by (now also removed) Bournemouth marker then moved to a position just off A31 north of Ferndown in April 2022 (corresponding to golf club location) before being removed in August 2022.
#6,611
(01/11/23)
Leicester - Beaumont Shopping CentreLeicester - Beaumont Shopping CentreTBCLeicester City Council
Ref 20231865
[Submitted 29/09/23]
x12 supercharger stalls in planning applications for Beaumont Shopping Centre, Beaumont Way, Leicester.#7,031
(02/02/24)
MoffatMoffat Public Car ParkTBCDumfries & Galloway Council ref 23/0905/CLP [Approved/permission not required 10/07/23]x8 V4 supercharger stalls shown in supporting statement document submitted with planning application.#5,845
(10/05/23)
#6,182
(22/07/23)
StranraerStranraer (Port Rodie Car Park)TBCDumfries & Galloway Council ref 23/0739/CLP [Submitted 13/04/23]x4 V4 supercharger stalls shown in supporting statement document submitted with planning application.#5,825
(03/05/23)


Ireland​

Map references

Supercharge.info map - Detailed site location information for existing and upcoming Superchargers for which there is firm evidence (planning or construction). Click on markers for detailed site information; for recent updates refer to the Changes tab.

Marker links in the tables below also reference Tesla's map.

Annual summary archive posts

2021 summary: UK and Ireland Supercharger Site News - 2021 Archive
2022 summary: UK and Ireland Supercharger Site News - 2022 Archive
2023 summary: UK and Ireland Supercharger Site News - 2023 Archive

Sites opened in 2024

Date openedSupercharger
(Tesla marker)
Supercharge.info
map reference
Target openingLocation (target marker location comments) & notesRef.
Coming Soon™...

Upcoming sites from Tesla.com/permits/construction/awaiting commission

The table below shows proposed sites with markers on Tesla's map, sorted by Tesla's Target Opening date. Historically, marker information has been approximate in terms of both location and timing and many markers end up being removed.

MarkerLocal NameTarget OpeningPlans/PermitNotesRef.
Cashel, Ireland2025Marker located south of Cashel, near M8 Jct 9.
Tesla map marker originally added in August 2022, target date Q1 2023, but removed at the end of 2022. Marker reinstated in March 2024, target date 2025.
 
Last edited by a moderator:
IMG_0643.JPG


Work underway as at yesterday.

I did see a report that the Darts Farm site near Exeter is being expanded with 8 additional bays (not verified).
 
  • Like
Reactions: TC56
This Electric article mentions Supercharger expansion at Birmingham Hopwood Park. The article speculates 12 more bays are being built but on another forum 5 charger crates were counted = 10 extra bays. Ironically the article is mainly about US Supercharger network expansion ahead of the release of the Model 3 which won't affect the UK for a couple more years, but the current spike in construction activity is great news for the UK Model S & X owners!

There is also construction activity at the Oxford Supercharger, where 5 crates (=10 extra bays) have been spotted.

Info for both of the above has been scraped from other forums, I haven't been able to check for myself.
 
If any of you have had the misfortune of waiting for an hour for one of the 2 bays in Warrington you will be pleased to know that there is a replacement site in plan.

Tesla representative acknowledged the issue, said it was well documented and a new site was coming soon, with old site to be decommissioned. Will be interesting to see if that is at the Lymm interchange so serving M56 and M6 both directions, or closer to Wales which is very underserved at Chester services perhaps.
 
If any of you have had the misfortune of waiting for an hour for one of the 2 bays in Warrington you will be pleased to know that there is a replacement site in plan.

Tesla representative acknowledged the issue, said it was well documented and a new site was coming soon, with old site to be decommissioned. Will be interesting to see if that is at the Lymm interchange so serving M56 and M6 both directions, or closer to Wales which is very underserved at Chester services perhaps.
The Warrington replacement is almost certainly Burtonwood Services M62 J8 site mentioned above, not quite as well positioned as Lymm to serve travel in all directions but 8 charger cabinets are apparently on site which will give much more capacity than the current 2 bay site. A bit of a detour for the route in to North Wales but Tesla do have another "coming soon" site on the A55. No news of any construction activity in that area though, so it could be a while; there is always the option to use Ecotricity chargers with a CHAdeMO adapter in the meantime.

In the past when travelling north from South Wales I have avoided Warrington in the expectation that I'd have to wait and/or share, making Hopwood and Keele a more reliable strategy so I'm happy that this new site will give me more route options.

I wonder if the Park Royal hotel will install destination chargers when the Superchargers are decommissioned? it would seem like a good location for such a set-up.
 
Stopped at Newport Parnell services (South) and saw this. Looks like a 20 bay supercharger station to me..
Not sure what the silver cabinets are to the right.

Also stopped at the fleet services (North) and saw a similar number supercharger going through the final implementation steps.
 

Attachments

  • IMG_0561.JPG
    IMG_0561.JPG
    334.5 KB · Views: 397
Stopped at Newport Parnell services (South) and saw this. Looks like a 20 bay supercharger station to me..
Not sure what the silver cabinets are to the right.

Also stopped at the fleet services (North) and saw a similar number supercharger going through the final implementation steps.
Thanks for the photo! As noted by WannabeOwner the Newport Pagnell Southbound Supercharger has 12 bays (see also Tesla's website). However, I have seen comments suggesting that there is enough cabling/space available for a future 12 bay expansion at this location.

The silver cabinets to the right are the Supercharger units which generate the DC charging current. The charging stalls (the white frames holding the charge cables) are fairly simple in comparison - essentially just cabling (and lighting for the Tesla logo). Each Supercharger cabinet can generate up to 120 kW DC; charging stalls are connected to cabinets in pairs and power is shared between them if two cars are charging at the same time. So at Newport Pagnell there will be 6 Supercharger cabinets (they are out in the open in this case there but at some locations they are hidden behind fencing).
 
I have seen a report of four Supercharger crates (=8 bays) spotted at Welcome Break Keele - Northbound (M6 Stoke-on-Trent). No photos as yet, but it would make sense to complement the four bays already installed on the southbound side. Hopefully the southbound side will also be expanded in due course.
 
I have seen a report of four Supercharger crates (=8 bays) spotted at Welcome Break Keele - Northbound (M6 Stoke-on-Trent). No photos as yet, but it would make sense to complement the four bays already installed on the southbound side. Hopefully the southbound side will also be expanded in due course.
 
Another report, this time for Tebay Services Southbound (M6 south of Penrith): construction pretty advanced with 8 charging stalls already in place. Confirmed by a couple of pictures on another Tesla forum. Great location: plugs a gap on the west coast route to/from Scotland but also handy for visitors to the Lake District.
 
The Warrington replacement is almost certainly Burtonwood Services M62 J8 site mentioned above, not quite as well positioned as Lymm to serve travel in all directions but 8 charger cabinets are apparently on site which will give much more capacity than the current 2 bay site. A bit of a detour for the route in to North Wales but Tesla do have another "coming soon" site on the A55. No news of any construction activity in that area though, so it could be a while; there is always the option to use Ecotricity chargers with a CHAdeMO adapter in the meantime.

In the past when travelling north from South Wales I have avoided Warrington in the expectation that I'd have to wait and/or share, making Hopwood and Keele a more reliable strategy so I'm happy that this new site will give me more route options.

I wonder if the Park Royal hotel will install destination chargers when the Superchargers are decommissioned? it would seem like a good location for such a set-up.

I sincerely hope they DO NOT decommission the Warrington SC's at Park Royal. They are perfectly placed for me, travelling from e.g. Manchester into Wales, and I am sure for the many others I see there. The new Burtonwood site is welcome for sure but would necessitate diverting through Liverpool.