Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Wiki UK and Ireland Supercharger Site News

This site may earn commission on affiliate links.
Birch coming on rather well. This was this afternoon and, whilst it looks very similar to Quavey's post above, there's some good progress on the construction of it. No Tesla elements there yet. One of the onsite construction guys said it was 8 Tesla and 8 Gridserve but we'll stick with the plans shared previously as this is just hearsay from someone driving a dumper truck.
IMG_7053.jpeg
IMG_7050.jpeg
 
Birch coming on rather well. This was this afternoon and, whilst it looks very similar to Quavey's post above, there's some good progress on the construction of it. No Tesla elements there yet. One of the onsite construction guys said it was 8 Tesla and 8 Gridserve but we'll stick with the plans shared previously as this is just hearsay from someone driving a dumper truck.View attachment 721424View attachment 721425
Way too long a space to only be 8+8 bays, so I firmly believe we will see exactly what was in the plans.
 
Can't claim first Charge, but can claim first Plug-In 😉 at Winchester SuC
Total of 12 Bays (that I could see), reverse in style along the north side of the Tesla Showroom.

Currently all Tombstones are offline and alot of construction equipment still on site. Can't imagine it's much longer, still needing lane marking, bump stop, etc.

Screenshot_3.jpg



Screenshot_4.jpg
 

Attachments

  • Screenshot_2.jpg
    Screenshot_2.jpg
    479.2 KB · Views: 61
  • Screenshot_1.jpg
    Screenshot_1.jpg
    509.8 KB · Views: 72
Reading Service Centre SuC update: delays due to needing a relocation of the bays from where originally planned. This likely means that they won’t be close to the planned coffee lounge, so that may be abandoned. Seems like they may now be placed at the opposite end of the site.
 
Last edited:
  • Informative
  • Helpful
Reactions: cezdoc and CMc1
Can't claim first Charge, but can claim first Plug-In 😉 at Winchester SuC
Total of 12 Bays (that I could see), reverse in style along the north side of the Tesla Showroom.

Currently all Tombstones are offline and alot of construction equipment still on site. Can't imagine it's much longer, still needing lane marking, bump stop, etc.

View attachment 722585


View attachment 722586
Spoke to the sales team a few days ago about the switch-on date and they said early next year. Currently there's no power unit installed on-site to feed power from the grid to the stalls and this is quite a big job, hence the timeline.
 
I had a quick look at the progress for the Trafford Centre.

They have started putting in the Supercharger bases. There looks to be 12 installed plus earthworks for possibly another 6.

They are all at the back of the car park furthest away from the old Debenhams. The digging near the garage looks to be cable laying, possibly to get power for the site. I haven’t taken a picture, but there is a large hole with cables in it close to the Trafford Centre and not connected yet.

There’s also Tesla branded kit in storage along with a couple of Supercharger bases.
 

Attachments

  • 31473668-177A-4B7A-83AE-742ED2E710BA.jpeg
    31473668-177A-4B7A-83AE-742ED2E710BA.jpeg
    675.2 KB · Views: 54
  • 303F999E-DB06-458B-8CA6-A9CB7129A33E.jpeg
    303F999E-DB06-458B-8CA6-A9CB7129A33E.jpeg
    1 MB · Views: 62
  • 9B2F5381-1C98-4303-84C5-0059692A3812.jpeg
    9B2F5381-1C98-4303-84C5-0059692A3812.jpeg
    778.3 KB · Views: 82
  • FD190E21-BE6E-47A8-81E9-04E005E84971.jpeg
    FD190E21-BE6E-47A8-81E9-04E005E84971.jpeg
    871.3 KB · Views: 72
  • 8BC269E8-FB5B-43ED-86C2-DEE9FD3D0757.jpeg
    8BC269E8-FB5B-43ED-86C2-DEE9FD3D0757.jpeg
    1.4 MB · Views: 66
  • 83506A4D-5987-4083-8980-AC19F3667DA0.jpeg
    83506A4D-5987-4083-8980-AC19F3667DA0.jpeg
    650.6 KB · Views: 66
  • 3AF5F13E-4490-4832-8AF9-A30204ADD925.jpeg
    3AF5F13E-4490-4832-8AF9-A30204ADD925.jpeg
    725.4 KB · Views: 73
Popped in here to add a quick update on The Trafford Centre and Stuart1714 beat me to it! I too accidentally (cough) turned into the car park and accidentally (cough) took some pictures! The more info the better I suppose.

Such a great strategic location for Tesla travels this one and the number of chargers is reassuring. Looking forward to it being operational!

IMG_7111.jpeg
IMG_7112.jpeg
IMG_7110.jpeg
IMG_7113.jpeg
 
Popped in here to add a quick update on The Trafford Centre and Stuart1714 beat me to it! I too accidentally (cough) turned into the car park and accidentally (cough) took some pictures! The more info the better I suppose.

Such a great strategic location for Tesla travels this one and the number of chargers is reassuring. Looking forward to it being operational!
Like quite a few SC locations in shopping areas, I do have some reservations about the location when it comes to Christmas shopping in November & December when the area becomes almost gridlocked.

A few months ago I had pick up my dad’s car from that same location when he had a medical issue and couldn’t drive home. I found that the car parks are closed at night so I wonder if these will be accessible 24 x 7.
 
I had a quick look at the progress for the Trafford Centre.

They have started putting in the Supercharger bases. There looks to be 12 installed plus earthworks for possibly another 6.

They are all at the back of the car park furthest away from the old Debenhams. The digging near the garage looks to be cable laying, possibly to get power for the site. I haven’t taken a picture, but there is a large hole with cables in it close to the Trafford Centre and not connected yet.

There’s also Tesla branded kit in storage along with a couple of Supercharger bases.

Popped in here to add a quick update on The Trafford Centre and Stuart1714 beat me to it! I too accidentally (cough) turned into the car park and accidentally (cough) took some pictures! The more info the better I suppose.

Such a great strategic location for Tesla travels this one and the number of chargers is reassuring. Looking forward to it being operational!

Looks like they have re-jigged the layout slightly compared with the proposals in the site plan submitted for Tesla's showroom/delivery hub planning application. What I assume are the 5x "proposed Tesla equipment" bases are now next to the transformer and DNO enclosure, and all appear to be taking up some space originally marked out for charging bays. It still looks likely that 18 stalls are going in based on @Stuart1714 's observations (12 + ?6 foundations) plus the fact that 18 stalls would need 5 charger cabinets.

2021-06 Trafford Site Plan Cropped.png
 
Scotch corner - Can anyone confirm if the stack of tombstone bases round the back of the hotel is new (possible expansion of this very busy site 🙏🏻 ), or just old discarded kit from the install?
Good spot! I don't think the site was reconfigured while under construction and I also stopped overnight there just before the chargers went live - and at that time I didn't notice any spare kit in the main car park. So I'd guess these are new, especially if still in wrappers.
I was there earlier this week, now I wish I'd wandered around the back while the car was topping up!