    Supercharger - Buellton, CA - McMurray Road (LIVE 6 Jun 2024, 20 V4 stalls)

    A fabulous and much-needed upgrade to this Supercharger location! Well worth the four-month closure. Kudos to the build team! 👍
  2. zeptomoby

    Supercharger - Buellton, CA - McMurray Road (LIVE 6 Jun 2024, 20 V4 stalls)

    Interesting that the Tesla app is showing "150 kW max". I've been secretly wondering for weeks if the new V4 hardware could go online with limited power using the transformer from the previous V2-based installation. Hey, it's never too early to speculate! In any event, it's great to see this...
  3. zeptomoby

    Supercharger - Buellton, CA - McMurray Road (LIVE 6 Jun 2024, 20 V4 stalls)

    Sorry for not being clear. This site was already a Supercharger site, right? Previously, there were 10 V2-style posts here. All those posts/cabinets have been torn out as part of the site upgrade to V3-style equipment. But did they yank out the transformer, too? I think I can see it in a...
  4. zeptomoby

    Supercharger - Buellton, CA - McMurray Road (LIVE 6 Jun 2024, 20 V4 stalls)

    I agree that many times the wait for a transformer to be delivered/installed can be excruciatingly long. However, regarding this Supercharger location, is it not the case that there is already a transformer on site? I'm wondering if that old transformer can be used to power the new cabinets and...
  5. zeptomoby

    Supercharger - Lompoc, CA - Constellation Road (LIVE 23 Apr 2024, 12 V3 stalls)

    Interesting...with two transformers, should we expect charging times to be cut in half? :)
  6. zeptomoby

    Supercharger - Mammoth Lakes, CA - Old Mammoth Rd. (LIVE 24 Nov 2023, 12 V3 + 4 L2)

    Stopped by the newly-opened site on Monday, Nov 27. Vehicles are free to enter the Recreation Center‘s parking lot, as none of it is blocked any longer by any type of construction fencing. Mammoth has already had some snowfall this season, as evidenced by areas around town that do not get much...
  7. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Yes they are. The site has quite the solar panel installation.
  8. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Visited the site today, Sunday, Nov 26. I can verify that there were 70 lighted Supercharger stalls ready for service: The site infrastructure now looks fully built-out, complete with three transformers and 18 Superchargers cabinets. Yep…that’s enough kit for 72 charging stalls; not sure why...
  9. zeptomoby

    Supercharger - Redding, CA - Hilltop Dr. (LIVE 15 Nov 2023, 44 stalls)

    Not much new details to add, but I thought I’d post some pics of the site to show the state of the project. All photos taken Oct 8, 2023. I For those that do not know it, the site is behind the main Holiday Inn building that faces Hilltop Drive, and somewhat adjacent to the rear building...
  10. zeptomoby

    Supercharger - Anderson, CA (LIVE 28 Mar 2024, 8 V3 stalls)

    Could it be that this location has enough electrical power that a transformer is not needed? I guess time will tell. Forgot to mention in my prior post that the contractor needs to get wheel stops installed here ASAP. The spots are open to anyone to park in them right now, but there is nothing...
  11. zeptomoby

    Supercharger - Anderson, CA (LIVE 28 Mar 2024, 8 V3 stalls)

    You know what’s got me flummoxed about this Supercharger installation? I don’t see any place to put the transformer. I don’t see a concrete pad or conduit. There is this spot nearby, but I really doubt that it’s a future home of a transformer, because there is no conduit plumbed:
  12. zeptomoby

    Supercharger - Mammoth Lakes, CA - Old Mammoth Rd. (LIVE 24 Nov 2023, 12 V3 + 4 L2)

    I stopped by on Labor Day and shot these pics. Not sure I ever realized that the Supercharger schedule looks to be tied-in with the new Community Rec Center schedule? Maybe the Supercharger, which looks fairly complete, will open to the public sooner than the center, but maybe not. I have no...
  13. zeptomoby

    Supercharger - Mammoth Lakes, CA - Old Mammoth Rd. (LIVE 24 Nov 2023, 12 V3 + 4 L2)

    Great progress - and it appears that the transformer has already been installed! This all bodes well for the site being online well before the snow flies.
  14. zeptomoby

    Supercharger - Bishop CA - Rocking West Drive (LIVE 22 Sep 2023, 24 V3 stalls)

    I visited the site on Saturday, July 15. No progress on the transformer. 🙁 Looking westerly: Looking southeast:
  15. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    I visited this location on Saturday, July 15. Good news: the destination chargers were energized. 👍
  16. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Visited the site on Sunday, July 2nd. The solar canopy install looks complete, and the construction fencing (and porta-potties) that I saw here in May are now gone. As reported by others, many of the pedestals are still covered. This is due to the fact that this site is still awaiting the...
  17. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    That is the case. You can see the ADA-compliant stalls adjacent to the damaged stall in the background of the photo. Also notice that those stalls have white bollards protecting the charging posts; I bet a similar treatment awaits the damaged stall. Or, at the very least, a wheel stop will be...
  18. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    I was here on May 28 in the evening; the destination chargers were not energized. This site looks to be waiting on at least one transformer. There is an empty concrete pad located in the south-east area of the site. A charging post looks to have been backed into. 🙁
  19. zeptomoby

    Supercharger - Lone Pine, CA (LIVE 28 Jan 2015, multiple expansions, 16 V3 stalls)

    I visited this site on the Monday of Memorial Day weekend. The site had several trash cans available, and the place was tidy. I’ve visited this location many times, but a couple of things were new to me on this visit. First, I’d never seen a porta potty here before. It was clean. Seems like a...
  20. zeptomoby

    Supercharger - Lone Pine, CA (LIVE 28 Jan 2015, multiple expansions, 16 V3 stalls)

    To my eye, this looks like the results of a garbage can being stuffed full of trash and then visited by wild critters in the night.
  21. zeptomoby

    Supercharger - Yermo, CA - Sunrise Canyon Rd (LIVE 25 May 2023, 40 V3 stalls)

    An absolute coup that this location is open in time for Memorial Day weekend! Kudos to all involved. 👍
  22. zeptomoby

    Supercharger - Lone Pine, CA (LIVE 28 Jan 2015, multiple expansions, 16 V3 stalls)

    I always liked this location...now with 16 slots! The Film History Museum is totally worth the $5 suggested donation, in my opinion.
  23. zeptomoby

    Supercharger - Jackson, CA (LIVE 5 Nov 2020, 8 V3 stalls)

    I visited this Supercharger the Monday after Thanksgiving. I was the only vehicle charging, and I was pulling a full 250 kW. We enjoyed a very nice lunch at Mel & Faye’s Diner. A pleasant experience all around. Next time you are charging here see if you can spot the SpaceX Starlink satellite...
  24. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Visited this site during the week of Thanksgiving. The build-out of the site to its full capacity is well under way! Workers have already installed 13 additional V3 cabinets, and were getting ready to pull copper. There are already 20 existing Supercharger stalls, and 13 more SC...
  25. zeptomoby

    MYP won't auto connect to Wi-Fi. "Unable to obtain IP address" error when manually connecting to wifi. Only a hard Reboot auto-connects successfully.

    This worked for me! I have two Model 3s, and they both started throwing the "Unable to obtain IP address" error message about 6 weeks ago. My home Wi-Fi network was unchanged for years, but out of desperation to fix this issue I changed my 2.4 GHz band to support "b/g" (it was set to the...
  26. zeptomoby

    Supercharger - Redding, CA (LIVE 11 Oct 2022, 8 V3 stalls)

    Stopped by today, on a Monday. The parking stall wheel stops are still AWOL - maybe they will never return? There was a nice-looking Rivian juicing up at the Chargepoint spot, not far from a Model Y with very aggressive-looking shoes! This thread doesn't have many photos of the immediate...
  27. zeptomoby

    Supercharger - Redding, CA (LIVE 11 Oct 2022, 8 V3 stalls)

    Interesting that the photos show that the wheel chocks have been removed. I guess that's easier than re-striping the stalls. In any event, yes, Redding finally has a working Supercharger!
  28. zeptomoby

    Supercharger - Redding, CA (LIVE 11 Oct 2022, 8 V3 stalls)

    I believe that the ChargePoint station shown in the photo is located in the parking lot next to the Sundial Bridge.
  29. zeptomoby

    Supercharger - Bakersfield, CA - Copus Rd. (LIVE, 20 V3 stalls)

    Charged here on Saturday, June 18, with no issues. The men‘s bathroom was clean; I have no information about the women’s. There is a Shell gas station being built immediately to the west of the Supercharger.
  30. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    I visited this Supercharger location on June 19th. All the photos below were taken on that date. There is a lot going on at this site, so I thought I would give a short write-up of what I saw. First, the Supercharger stalls that are currently in service. As previously reported in this tread...
  31. zeptomoby

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Visible in one photo posted by siromega is what appears to be pre-cast Supercharger pedestals (left-hand side of third photo). I would say extremely high probably of this being a Supercharger site! I only mention because the title of this thread still indicates "awaiting confirmation".
  32. zeptomoby

    Supercharger - Santa Nella, CA (LIVE, 48 V3 stalls)

    This photo was taken on Monday, October 25. It is the dirt lot on the north side of the Hotel De Oro. Now, what do you think all that conduit could be for? 🙂 If you really zoom in on the photo, you might just make out the worker in a safety vest who was measuring/marking off what looked like...
  33. zeptomoby

    Supercharger - Weaverville, CA (LIVE 10 Feb 2022, 8 V3 stalls)

    A few more shots showing on-site conduit, as well as paint markings showing where trenching will be done.
  34. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    I went by the site yesterday (Monday). I did not see any evidence of any construction work being done at the Supercharger site. But the Ditch Witch was gone, replaced with this enormous roll of conduit. There is a fair amount of utility work being done on Lakewood Drive, near where the...
  35. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    A large Ditch Witch ”vacuum excavation” unit has arrived on site. According to the operator’s manual I found online, it can be used for “soft excavation, including exposing utilities for visual verification and potholing”. I’m also guessing that it can clean that Honey Bucket lickety-split. :)...
  36. zeptomoby

    Supercharger - Redding, CA (LIVE 11 Oct 2022, 8 V3 stalls)

    The "Underground Service Alert" spray paint markings in the field tell me someone is going to be digging up that lot pretty soon!
  37. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    The plot thickens! I think is is safe to assume the transformer will be located on the (new) concrete pad. Regarding the new vault, I have two (speculative) thoughts: 1. This new vault will replace an existing, smaller vault that is located under/near the sidewalk north of the site (see...
  38. zeptomoby

    Supercharger - Inyokern, CA - Locust Ave. (LIVE 6 Sep 2021, 12 V3 stalls)

    Other than the conduit arriving on site, not much progress to report. These photos were taken on Sunday, May 23rd.
  39. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    I went back for another look. Without a doubt, the crew is running conduit between the transformer location and a subterranean service box/vault next to the sidewalk. They were also running pull tape through the new conduit.
  40. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    After over a month of no visible progress, E-TECH is on site today! And indeed they are in excavation mode. It appears that they are extending the conduit from the transformer to under the sidewalk. If I have read the “service alert” paint markings correctly, there is PG&E service under the...
  41. zeptomoby

    Supercharger - Fort Bragg, CA (LIVE 21 May 2021, 12 stalls)

    I don't see a transformer in the photos. I do see what seems to be an empty concrete pad (to the right of the SC cabinets). It will be a race to get that installed and checked out by the 4th. But hey - "May the fourth be with us"! :)
  42. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    The Underground Service Alert markings were updated/refreshed just a few days ago. I don’t know for sure, of course, but it certainly looks like E-TECH plans to excavate this area soon. A PG&E truck was parked there today. The gentleman inside of it told me he was there to do some...
  43. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    The transformer pad was installed today. The sidewalk and the parking lot are still intact.
  44. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    Good news: Not only was E-TECH on site today (as usual), but so was Tesla and PG&E! They were very busy moving ahead on the PG&E transformer install. There are two transformer trenches actively being worked. In the first photo, a worker is standing in the north trench. It is headed...
  45. zeptomoby

    Supercharger - Williams, CA - 6th Street (LIVE 18 Dec 2019, 12 V3 stalls)

    Here’s a photo of the four new stalls I took on Monday, March 22nd. Also visible is the third SC cabinet. @bmah Would it be appropriate to update the title of this thread to indicate 12 stalls?
  46. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    This project is entering the final phases. All the wires have been pulled to the charging pedestals and the giant spools of copper wire now sit empty. The crew looks to be wrapping up a few final details, like painting. However, there is still no progress to report on the PG&E transformer...
  47. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    The parking lot paving was completed yesterday. The screen/fence is going up around the electrical distribution and SC cabinet hardware. All twelve charging pedestals are installed, but pulling electrical wire to each has not yet been done. There is no progress to report on the location where...
  48. zeptomoby

    Supercharger - Windsor, CA (LIVE 5 Nov 2021, 12 V3 stalls)

    All pedestals installed! Looking good.