In a post on the Wichita Falls, TX Supercharger thread somebody posted a link to the list of NEVI awards round 1.
The list is here:
The link is from this page:
The awards list document is from 2/15/2024.
Tesla's, from a list of 56 sites and 244 ports:
#, location, ports (I assume counting as subsidized by NEVI)
6 San Marcos 10 (35, 12V2)
8 McAllen 5 (2, 8V2)
9 Burleson 7 (35W Permit)
13 Wichita Falls 5 (44 Permit)
17 Gainesville 7 (35 Permit)
38 Cotulla 5 *** (35 Laredo to Natalia)
44 Monahans 5 (20 Pecos to Midland)
47 Shamrock 5 (40, 6V2)
49 Raymondville 5 * (69E Harlingen to Kingsville)
*** OMG OMG OMG OMG OMG OMG Splitter #11!
* Future Splitter #6
Supercharger - Wichita Falls, TX
TDLR Filing for a Supercharger at a QuikTrip in Wichita Falls right off of I-44. 1526 Old Iowa Park Rd. Wichita Falls, TX 76306 1526 Old Iowa Park Rd. Wichita Falls, TX 76306
teslamotorsclub.com
The list is here:
The link is from this page:
Texas electric vehicle planning
As required by the National Electric Vehicle Infrastructure Formula Program, TxDOT submitted its Texas Electric Vehicle Infrastructure Plan to the federal Joint Office of Energy and Transportation.
www.txdot.gov
The awards list document is from 2/15/2024.
Tesla's, from a list of 56 sites and 244 ports:
#, location, ports (I assume counting as subsidized by NEVI)
6 San Marcos 10 (35, 12V2)
8 McAllen 5 (2, 8V2)
9 Burleson 7 (35W Permit)
13 Wichita Falls 5 (44 Permit)
17 Gainesville 7 (35 Permit)
38 Cotulla 5 *** (35 Laredo to Natalia)
44 Monahans 5 (20 Pecos to Midland)
47 Shamrock 5 (40, 6V2)
49 Raymondville 5 * (69E Harlingen to Kingsville)
*** OMG OMG OMG OMG OMG OMG Splitter #11!
* Future Splitter #6
Last edited: