You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
I believe construction begins this week.
The location that makes the most sense would be the Meijer at 13 Mile and Little Mack. Although it's technically in Roseville, it's right on the border of St. Clair Shores so maybe that's what they were thinking.I'm going to assume after construction here is done the same crew will work on St. Clair Shores. Though I'm not sure that there's even a great parking lot location in that city. Seems like Tesla was just aiming for the 696-94 interchange.
Exactly my thoughts. It's easy to assume Meijer, but I'm sure we'll find out this month.The location that makes the most sense would be the Meijer at 13 Mile and Little Mack. Although it's technically in Roseville, it's right on the border of St. Clair Shores so maybe that's what they were thinking.
Nothing to report . Only equipment was for a large AC installation with crane. Being watched carefully by a security guard. Flags or survey marks were from previous repaving of parking lot a number of weeks ago.
I will check it once a week till I can chat with someone.