On Saturday March 30th, took advantage of a break in the weather when passing by.
Looking West - switch gear and transformer pad in place, the last of the major physical installation before transformer (though need wiring done and inspected before calling the power company).
Looking Northwest-ish. Covers back on pedestals so the DC wiring must be done, spools of 480/277 volt AC wiring (Brown, Orange, Yellow for the 3 phases, with Gray neutral) visible, ready to wire V3 electronics cabinets to switchgear.
Looking West - switch gear and transformer pad in place, the last of the major physical installation before transformer (though need wiring done and inspected before calling the power company).
Looking Northwest-ish. Covers back on pedestals so the DC wiring must be done, spools of 480/277 volt AC wiring (Brown, Orange, Yellow for the 3 phases, with Gray neutral) visible, ready to wire V3 electronics cabinets to switchgear.