Why are you surprised? Unless the Medway Superchargers are open to ALL CCS vehicles, i.e. MagicDock, and has special software to guarantee 150kW on at least 4 stalls it isn't a NEVI compliant site and can't be taken into account when determining where to place the NEVI funded sites. (Being a 6 stall V2 site, it likely only has 500kW of power available, which also doesn't meet the NEVI 600kW minimum.)I am a bit surprised at the Millinocket choice. It is only 10 miles from the Medway SC. I have never seen Medway busy — even on eclipse day there were empty slots. Usually I am the only one charging, been there half a dozen times.