aerodyne
2 of 3 EV's - Defect Free!
Do I see hammer marks on dose hinges like mine came with?
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Do I see hammer marks on dose hinges like mine came with?
A feature that was literally promised, yet not delivered on.
Seems like now is the time to order an LR, if one has not already.
For the plaid, might be new seats or something, but that might come with a price increase.
This isn't an inventory thing, this is a Model S thing. All model S cars come with the license plate attached to the front bumper using double sided tape. Thankfully this is fairly easy to remove and if you do take it off right away you will be left with a nice clean bumper.Is it the usual thing for inventory Teslas to be ruined by drilling holes in the front bumper in California? Even my MXP license plate holder which was not installed and in the frunk is attached with adhesive, not screws.
There's no holes. The screws you see attach the holder to a bracket that is attached by adhesive.Is it the usual thing for inventory Teslas to be ruined by drilling holes in the front bumper in California? Even my MXP license plate holder which was not installed and in the frunk is attached with adhesive, not screws.
Also is it just that I'm on my phone or do those photos look the same...So looking at the configurator for the S currently, noticed a couple things
1) The steering wheel horn symbol is showing in the render now
2) For the Plaid seats, the render shows some extra stitching that wasn't present on the 2023 model. Examples below. Don't know if that's a real change or fixing a render -- I'd have to look at my own seats to compare (though I know my seats don't have any light colored stitching like the render seems to show)
2024:
View attachment 1012949
View attachment 1012951
2023:
View attachment 1012952
View attachment 1012950
Edit: And for the LR it's showing some contrast piping that wasn't there in the 2023 and earlier models
2024:
View attachment 1012953
2023:
View attachment 1012954
I think you'll be getting it before mid-March.I ordered a MS (DM/LR) on Dec 1, 2024 and am seeing "Est. Delivery: January 29 - March 4" in the app and online. But no VIN yet so obviously it will be mid-February at the earliest. I really need it before mid-March because I'm planning a road trip with it at the end of March.
I could fall back to the old ICE car but what's the fun in that???
I think the new seats may be associated with the future Track PackageSeems like now is the time to order an LR, if one has not already.
For the plaid, might be new seats or something, but that might come with a price increase.
My 12/13/23 MSP order just moved from Jan-Feb to Feb-Mar. Thinking of cancelling although I have already installed a wall connector and bought a portable connector. With with the recent analysts updates, makes me wonder if they are not producing because they are not selling, or not selling because they cannot produce. Either way, it helps explain the drop in Tesla Inc shareholdings.
My 2022 S Plaid seats has this stitching.So looking at the configurator for the S currently, noticed a couple things
1) The steering wheel horn symbol is showing in the render now
2) For the Plaid seats, the render shows some extra stitching that wasn't present on the 2023 model. Examples below. Don't know if that's a real change or fixing a render -- I'd have to look at my own seats to compare (though I know my seats don't have any light colored stitching like the render seems to show)
2024:
View attachment 1012949
View attachment 1012951
2023:
View attachment 1012952
View attachment 1012950
Edit: And for the LR it's showing some contrast piping that wasn't there in the 2023 and earlier models
2024:
View attachment 1012953
2023:
View attachment 1012954
This has been the operating process for non-inventory orders for about two months. I ordered on December 6 when the order page had the generic January through February indication. The very first order update came eight days later on Dec 14, which updated to January 28 through March 10. That date remained for 1.5 months, but it recently narrowed to February 2 through March 8. However these results are atypical to what was happening before the influence of the model year changeover. Before this, most orders in US we’re being filled in 2-4 weeks.My 12/13/23 MSP order just moved from Jan-Feb to Feb-Mar. Thinking of cancelling although I have already installed a wall connector and bought a portable connector. With with the recent analysts updates, makes me wonder if they are not producing because they are not selling, or not selling because they cannot produce. Either way, it helps explain the drop in Tesla Inc shareholdings.
Don't cancel because of moving EDD. Moving EDD is normal for more than ten years.My 12/13/23 MSP order just moved from Jan-Feb to Feb-Mar. Thinking of cancelling although I have already installed a wall connector and bought a portable connector.
I think I could delay my order for 2025 VINNow that 2024s are out can we start worrying about waiting for 2025 VIN?