We recently had a solar system installed that includes 2x Powerwall 3s and Telsa Backup Gateway 2. We're configured for partial backup with the A/C, Pool Pump, and Furnace remaining on the main panel. All other loads are on the backup panel. Our system is working flawlessly for all the backup loads, and we can monitor the coming and going of power through the system. However, the non-backup loads on the main panel continue to draw power from the grid and are not taking advantage of the self-generated power. I understand that this is because the Powerwall 3 does not support third party monitors, like Neurio that can help solar side determine where power flows from battery to grid. Anyone else experiencing this very frustrating and significant gap in the Powerwall 3 capability? We are continuing to draw ~15kwH per day to support our pool pump and that will double once temperatures start rising and we need our A/C. Is the short-term solution to move all loads to the backup side or wait for Tesla to offer a solution? Interested in your thoughts.