From the link you posted this will be 4 car spaces, for cars, and two chargings units with two cables each. As this looks like it will fulfill the federal NRMA grant sites it will likely follow three CCS and one Chademo like the others in the rollout.Four parking spots and four cables, but two stalls.
Plugshare entry suggests both CCS2/CHAdeMO, but hopefully at least one is dual CCS2
Note this is distinct from the exisiting NRMA site in lithgow that has an exisiting two stall/space setup with a CCS/Chademo charge unit for each space.
In other Lithgow news, but not NRMA, someone has also added that Hungry Jacks, on the highway, is getting two CCS two Chademo Evie site. Not a lot of detail, nor any photos, so not sure how accurate that data is.