Tesla did the site survey on April 19 for a 4 KW system with a power wall. The job is permitted and PG&E initial docs are completed. I have no other docs to finish. The inspector said the roof (standing seam, newly installed) would present no problems. As of today, I’m waiting for Tesla to...