About 1 year from initial deposit, planning, permit, scheduling and install. Install was Jan-2021 for roof, May for PowerWall, July for electrical panel upgrades and PTO was Late-Dec 2021, but the major delay was electrical. I had 120v and needed 240v, glad the cable connected to PGE was already...