Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Recent content by The Original O

  1. T

    Supercharger - St. Louis Park, MN

    That is such a bummer. Guessing it'll be a pretty big delay having to figure out what happened, order a new pedestal, remove the old one and fix the damage, install the new one, inspect the whole thing, and finally turn it on. This proves to me that they picked a bad location in the lot for this...
  2. T

    Supercharger - St. Louis Park, MN

    Word on the street, the street being the MN Tesla Club, is that this along with the other MN and ND sites won't have any progress until spring. They have sources who wish to remain anonymous, presumably someone within Tesla. Seems to fit considering there seems to be no progress at any of the...
  3. T

    Supercharger - St. Louis Park, MN

    Drove by late last night, no change since the transformer went in
  4. T

    Supercharger - St. Louis Park, MN

    Yep! The layout of the concrete pads matches what we've seen on the V3 installs that are going on in ND and all through Canada right now; pads for 2 cabinets and 1 transformer. A lot of the Canada ones are 6 stalls, but they still use 2 cabinets and leave one space on each "Reserved for future...
  5. T

    Supercharger - St. Louis Park, MN

    Yep that would be the one. You can also check supercharge.info/map for a more accurate map than Tesla has on their website
  6. T

    Supercharger - St. Louis Park, MN

    The concrete pads are for the transformer and 2 supercharging cabinets, not batteries. The pad on the far left at this site is for the transformer and connects over to the existing electrical grid. The two pads to the right of that are for the cabinets that connect the transformer to the...
  7. T

    Supercharger - St. Louis Park, MN

    Not allowed to post pics yet but went by tonight. Concrete is poured around all the pedestal locations as well as the 2 pads for the cabinets. The pad for the transformer isn't poured yet, wondering if they're waiting to run the wires to the connection point with the grid? Can confirm what...
  8. T

    Supercharger - St. Louis Park, MN

    Here are some photos from an hour ago, looks like they finished most of the concrete today https://photos.app.goo.gl/RvrMLGZirYAh3GbdA
  9. T

    Tesla App 3.10 for Android Users

    Google Play Store is really dropping the ball for me. I've had V10 since 11:45 PM last night but there is still no update for the app showing up on the store. This worked perfectly, thanks!
  10. T

    Supercharger - St. Louis Park, MN

    Drove by late last night. No markings or flags in the section of the lot that they were measuring. The section that is closed off now has a single shipping container on it like we've seen at a few other new SC locations. Maybe they're using that spot for staging/storage? Or maybe that's where...