Hi All, With EV2 and a pending solar installation in Sam Mateo county. I used the PG&E calculator and answered 100% offset for solar, and 200 miles/week charging. I was shocked to see the EV2 plan would be much more, while all the other rate plans would be the minimum charge. What gives?