    Supercharger - Abbotsford, BC

    Some progress made. The cabinets are unpacked and mounted to their pads. The coms panel is mounted. Not sure what needs to be done to finish that. Realized I could see inside the distribution cabinet, but it doesn't look like cables are pulled from the electrical room on the other side of the...
  2. L

    Supercharger - Abbotsford, BC

    In addition to the bump stops and sign posts, the conduits have been cut down to size, pull strings have been added, and the pull box has been mounted and piped into the distribution cabinet. At this point, (without having access to the main electrical room to the right of the distribution...
  3. L

    Supercharger - Abbotsford, BC

    Took a look on my way back from work today. No new progress to report. If they can get the rest of the equipment, I'd say they have at least 3-5 full days worth of work to finish the install of the charger. No idea what sort of commissioning process Tesla has once the base install has happened...
  4. L

    Supercharger - Abbotsford, BC

    Made an account just to respond to this. It does look like progress has been made. The transformers have been moved, and some distribution gear is now installed on the wall. This is good. The site is no longer idle.