  1. 6

    Supercharger - Lost Hills, CA (LIVE 22 Nov 2023, 20 V3 stalls)

    I guesstimate another 4-6 months, esp. with the rainy (hopefully) season coming. Based on my daily observation of an SC station 0.3 miles from my home that opened earlier this year in a supermarket/restaurants parking lot.
  2. 6

    Supercharger - Hollywood, CA (under construction Sep 2023, 32 stalls + diner)

    Not going to be fun living across the street from a 24/7 diner/drive-in theater/32 stall charge station, lol. Will this be a Tesla only station?
  3. 6

    Supercharger - Laguna Hills, CA - Moulton Pkwy (LIVE 2 Nov 2023, 16 V3 stalls)

    Two months seems a very short span between permit and construction start. My observation is more like several months, if ever. But great if it really is an SC construction start, we’ll know soon enough. Although SC hardware is often late incoming, I know this from a 24 stall SC station just...
  4. 6

    Supercharger - Laguna Hills, CA (LIVE 20 Jun 2023, 16 V3 stalls)

    This one just opened. Showing up on the Tesla app. Must have happened yesterday or today.
  5. 6

    How to make software change requests?

    Here’s another tweak I’d like to see: I’ve got it set to open my garage door and fold the mirrors on my MS as I approach my house. However, later when I want to go out the car wakes up, opens the door handles and unfortunately also opens the mirrors, it knows it’s at my home so why open the...
  6. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    Now I'm really confused as these new stalls have neither red signs nor bump stops and cables don't look long enough to reach across from the other side of the car. There are two stalls tucked away in one corner across the aisle adjacent to the cabinets then two more stalls with disabled parking...
  7. 6

    Supercharger - Laguna Hills, CA (LIVE 20 Jun 2023, 16 V3 stalls)

    The two stations in MV are 72kW chargers, Tesla is putting in V3 in nearly all new stations including this new one. The one in Lake Forest is still not open despite being visually completed two weeks ago. I spotted a work pickup or two on two occasions with someone working on the cabinets, open...
  8. 6

    Supercharger - Ashland, OR (LIVE 1 Sep 2023, 24 V3 stalls)

    The Ford EV owner should be telling Ford to start their own charging network instead of whining about no chargers for her EV.
  9. 6

    Supercharger - Ashland, OR (LIVE 1 Sep 2023, 24 V3 stalls)

    I still chuckle at ‘Tesla Killers’, now Tesla is killing them.
  10. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    Looks a bit confusing to me, have not seen this kind of setup before.
  11. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    I assume this means the cables are longer since it would be easy for a Tesla driver to get confused depending on which side/space you back into for a given charger. Also I notice there are two handicap stalls, which is strange unless they are much wider for those that need to use a walker or...
  12. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    As of today, the pavement has been redone and new striping is in, looks great. It’s probably waiting for final city inspector approval. A few days ago the fencing was removed and screening plants put in to eventually hide the large white cabinets alongside the street. I’d guess turn on will...
  13. 6

    Supercharger - Needles, CA - W. Broadway St. (LIVE 9 Dec 2022, 12 stalls)

    Tesla’s SC network map now shows this 12 stall V3 location to be open. Supercharger Info map needs updating.
  14. 6

    New Sales and Service Center - Orland Park IL

    It seems to be adjacent to the Apple Chevrolet dealership. Who will be left standing in 10 years?
  15. 6

    Supercharger - Orland Park, IL

    Interesting and good that 12 stalls are going in, Supercharger.info pointer says 8.
  16. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    Construction has started, a fairly large area of the parking lot adjacent to Muirlands has been fenced off with green screening. A piece of heavy equip can be seen, probably a backhoe. Over 2 in. of rain today so no progress but at least construction has started.
  17. 6

    Supercharger - Needles, CA - E. Broadway St. (LIVE 27 Feb 2023, 12 V3 stalls)

    It’s been about 2.5 months since the SC stalls were put in place. So what’s the status now? This place is neeeeded, lol.
  18. 6

    Supercharger - Anaheim Hills, CA (permit issued, 16 V3 stalls)

    Its disappeared from the Tesla SC network map. Pointers saying coming at some future qtr can’t be trusted, they come and go.
  19. 6

    Supercharger - Needles, CA - W. Broadway St. (LIVE 9 Dec 2022, 12 stalls)

    Well they sure neeeed one there. 12 more ain’t bad but should have been 16+ but likely not enough space.
  20. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    The Mission Viejo ‘pending’ pointer on the Tesla SC network map has disappeared, again, second time in a year. Only the Lake Forest and Laguna Hills pointers remain. Need a large station in Laguna Hills too, with the latest OTA update the historic usage by time of day bars now show on the...
  21. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    Two in Mission Viejo, one in the Mall area with 10 stalls the other on Crown Valley in the Kaleidoscope building lowest parking level, 8 stalls, both are V1.
  22. 6

    Supercharger - Lake Forest, CA - Muirlands Blvd. (LIVE 27 Feb 2023, 24 V3 stalls)

    Chili Chutney is a great restaurant, Afghan food similar to mid-eastern, one of our favorites. The restaurant faces Muirlands and a couple doors down from the former Starbucks which closed during the pandemic. Starbucks should reopen with the SC station going in.
  23. 6

    Supercharger - Tustin, CA - Flight Way (LIVE 20 Dec 2022, 7 V3 stalls)

    No, that is incorrect. Tesla’s SC map also shows coming SC sites with expected qtr but no details, that is what the gray pointers are, just click on a pointer. However those pointers don’t all show what’s coming, including those for which permits have been issued or that are already under...
  24. 6

    Supercharger - Tustin, CA - Flight Way (LIVE 20 Dec 2022, 7 V3 stalls)

    This SC site is not showing on Tesla’s SC network map, strange.
  25. 6

    Sentry mode "screen saver?"

    Maybe you set Sentry Mode to not activate if you are parked at home, that is an option.
  26. 6

    keep mobile connector plugged in? or unplug after use

    Except that it is always drawing a little current since the lights on the connector are always on.
  27. 6

    what is the proper procedure for suggesting a supercharger location?

    As of today the form still asks if you are interested in hosting a Supercharger or Wall connector, you have to pick one in order to submit a suggestion. I picked SC but noted in the short comments I was not interested in hosting. I also designated myself as a Tesla owner in one of the blanks...
  28. 6

    Camera hidden inside Model S cabin?

    Keep your fly zippered just in case, lol