Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Search results

  1. D

    Supercharger - Lost Hills, CA (LIVE 22 Nov 2023, 20 V3 stalls)

    I thought I noticed bollards being put in on a site north of Hwy58 in east Bakersfield. So I check for a permit, that is how I found these permits. I have since passed through that area and cannot identify the site. I must have been imagining the site.😁
  2. D

    Supercharger - Lost Hills, CA (LIVE 22 Nov 2023, 20 V3 stalls)

    This will need to be moved. I think this is a permit for a supercharger located near Hwy 46 and I5.
  3. D

    Supercharger - Mojave, CA - Sierra Hwy (LIVE 18 Aug 2022, 12 V3 stalls)

    Moderator note: The first few posts on this page are a merge of posts from at least two different threads. I found another permit for Mojave.
  4. D

    Supercharger - Bakersfield, CA - Enos Ln. (LIVE 16 Sep 2022, 12 stalls)

    I found an application for a permit this morning. This will need to be moved. This is for a site to be constructed Hwy 43/Taft Hwy intersection.
  5. D

    Supercharger - Tejon Ranch, CA - Outlets at Tejon Pkwy (LIVE 1 Sep 2021, 76 V3 stalls)

    I stopped by here on Monday Aug. 30 to check out the progress of this site. The two green transformers are in place. Hopefully this site is goes live in the near future.
  6. D

    Supercharger - Bakersfield, CA - Copus Rd. (LIVE, 20 V3 stalls)

    Simple. I was driving from Tehachapi. The navigation system took me through Arvin to Wheeler Ridge Rd. to David Rd. that turns into Copus Rd then left on Old River Rd. to HWY 166 to Santa Maria. The site is about 150 yards west of I-5 and about 3 miles west of Hwy 99. I had it wrong last...
  7. D

    Supercharger - Bakersfield, CA - Copus Rd. (LIVE, 20 V3 stalls)

    While driving to the coast, I found this construction. The construction is located on Copus Rd. just west of the I-5 and about 1/2 mile west of Hwy 99. I think it is about 2 miles north of Hwy 166 and maybe 6 miles north of the current Tejon superchargers. There appears to be 20 chargers at...
  8. D

    Supercharger - Traver, CA (LIVE 18 Nov 2020, 16 V3 stalls)

    Could it be a lack of internet? If the power is there and the electrical system has passed inspection, Tesla should have turned it on already. I went to a place 4 miles west of here yesterday and to get internet they have to pay $200 a month. It is wireless. Rural areas don't have the same...
  9. D

    Supercharger - Traver, CA (LIVE 18 Nov 2020, 16 V3 stalls)

    Tesla has a new permit for a megapack install at this site. Hopefully the site will be turned on before the batteries are installed. The first permit probably failed for arc fault protection, ground fault requirements or the open conduits into high voltage switching gear. That is my supposition.
  10. D

    Supercharger - Traver, CA (LIVE 18 Nov 2020, 16 V3 stalls)

    I will visit this site in a week or two and post update photos.
  11. D

    Supercharger - Traver, CA (LIVE 18 Nov 2020, 16 V3 stalls)

    This spot is located just north of Bravo Farms on the west side of the road. You can see the barn on Goggle maps. I drive in this area all the time...this is great.
  12. D

    Text from Tesla - but no VIN/MVPA yet

    Same 2-4 weeks Mine is white/black/AWD/20"/tow hitch
  13. D

    Anyone not get the text blast yesterday?

    I received this message yesterday. Mine is White/Black PUP no FSD with tow hitch, ordered in April 2020