  1. R

    Supercharger - Simi Valley, CA - Erringer Rd (under construction Feb 2024, 8 V3 stalls)

    I counted 10 concrete blocks for stalls on 5 pallets on 2/3/24. Also went by there on Valentines day and they had begun digging to reach the SCE lines in the street. Will post updates, I drive by here 2x a day for work and we go by Toppers often.
  2. R

    Supercharger - Baker, CA - Expansion

    I went through here on May 24th and the solar canopies were already painted and solar was being wired. Lot was paved and all the stalls were in and some being wired. I assume this will be like other SC's in SCE territory waiting on the transformer to show. The Tesla app actually shows as of...
  3. R

    Supercharger - Barstow, CA - Tanger Way (LIVE, 70 V3 stalls)

    Charged here on 12/27 and all the new stalls are in but the transformer is not there yet. Everything looks turn key otherwise. Great spot. Came from ventura county and this was the perfect middle ground charge spot to make it to henderson.
  4. R

    Supercharger - Buckeye, AZ

    The expansion is nice but really need to expand more. There was a wait for this on Sat 4/9. Plus if you got stuck on a 150kw shared stall the time to charge was almost 40 mins. Luckily most do not know which stalls are 250kw so I was able to move over to a 250kw and get the charge I needed...
  5. R

    Supercharger - Glendale, AZ

    Tesla Owners of Phoenix on Facebook had a picture. Just as hyperdriveAZ said lines down and asphalt but no power yet. Tesla logos are dark.
  6. R

    Supercharger - Lake Arrowhead, CA (LIVE 17 Nov 2021, 8 V3 stalls)

    I checked just the other day and it was back on the nav. I'm assuming maybe SCE was doing line maintenace or something. They've been doing a lot of work up there.
  7. R

    Supercharger - Baker, CA (LIVE / EXPANDED 40 V2 + 20 V3 stalls)

    Drove through Monday and Thursday this week. No signs of anything going on. But this is needed. Came into Baker and enjoyed 150kw for just a few mins before I was sharing a stall. All 40 were full. On the way back Thursday it was about half full when we drove by but stopped in Barstow. This...
  8. R

    Supercharger - Simi Valley, CA - Tierra Rejada Rd. (LIVE 22 Sep 2020, 12 V3 stalls)

    Finally got the picture. These are the 4 new stalls in the background of the picture. 16 total.
  9. R

    Supercharger - Lake Arrowhead, CA (LIVE 17 Nov 2021, 8 V3 stalls)

    San Bernardino County released the project to SCE. So I assume now we are waiting on the transformer to arrive. Several inspections in the days around 9/23/21 occurred. Inspected 9/22 one note and then "APPROVED MSP AND RELEASED TO SCE 9-23-2021 JG". One could assume everything is ready minus...
  10. R

    Supercharger - Simi Valley, CA - Tierra Rejada Rd. (LIVE 22 Sep 2020, 12 V3 stalls)

    Not sure how Tesla is doing their math but the in car and Tesla app show 22 stalls now. They did install 4 more physically (as mentioned by sdandersonjr) but the tesla plug is dangling over the top so I assume they are not yet working. I think the new number will be 16. I'll stop by this week to...
  11. R

    Supercharger - Lake Arrowhead, CA (LIVE 17 Nov 2021, 8 V3 stalls)

    I think one could assume construction has started based on the last inspection completed yesterday. Comment from inspector shown below. I wasn't able to look at the far side of the village when I was up last weekend. I know it is not in the main parking areas of the lower lot or upper lot. But I...
  12. R

    Supercharger - Lake Arrowhead, CA (LIVE 17 Nov 2021, 8 V3 stalls)

    On 7/6/21 the building permit requirements were issued. Contractor named. They have 7/6/21-1/2/22 to build. So I expect we seem some progress soon. The contractors website has quite a few Tesla stations on it, so looks like they are quite experienced. Finally we can charge up after killing the...
  13. R

    Supercharger - Lake Arrowhead, CA (LIVE 17 Nov 2021, 8 V3 stalls)

    I emailed the Lake Arrowhead Village to see if there was any status, to no response. But maybe they sent an email to Tesla. Bummer they will probably miss most the summer traffic by the time it gets online.
  14. R

    Supercharger - Van Buren, AR

    Thank you both for those locations! Will probably use the Jiffy Mart location. Considering also just towing the Tesla and driving my truck so my Wife and I dont both have to drive. Probably not till April so I imagine the Van Buren will be opened. Thanks again.
  15. R

    Supercharger - Van Buren, AR

    Any chance anyone can circle back on this supercharge? I have a pending job offer that will require us to take the I-40 in the next 6-8 weeks. I imagine it will be live by then but it would be great to know. Otherwise that stretch of 224 miles (from Oklahoma to Ozark) is cutting it a little...
  16. R

    Supercharger - Simi Valley, CA - Tierra Rejada Rd. (LIVE 22 Sep 2020, 12 V3 stalls)

    Drove by today and the rectangular cabinets are still on the pallets. The concrete bases for the supercharger stands are in the ground. Haven't seen much change in the last 7 days.
  17. R

    Supercharger - Simi Valley, CA - Tierra Rejada Rd. (LIVE 22 Sep 2020, 12 V3 stalls)

    Drove by today and the white cabinets were in. Will snap a picture this weekend. Can't see ever using this as I charge at work with a L2 charger for free. But will be nice to have the option.