    Speed up PTO?

    The emails I received from SCE did not include the details such as the engineering assignment. I was pretty surprised to get the PTO on a Saturday!
  2. G

    Speed up PTO?

    update: PTO granted on 11/21.
  3. G

    Speed up PTO?

    solar roof passed inspection 10/23 Tesla put in for PTO to SCE 11/2 PTO denied on 11/16 - customer sizing waiver sheet was not filled out right and they want load calcs Tesla resubmit for PTO 11/16
  4. G

    SolarRoof owners - how do we monitor string production?

    If you use the “m tool” app (either ios or android) it should just find your device (inverter). Select the device, enter your date code (on the side of the inverter) and it should just display your inverters string voltages and overall power of the system.
  5. G

    SolarRoof owners - how do we monitor string production?

    The Delta M Tool app or m tool professional app will show you individual string data. It is a Bluetooth app so you have to be fairly close to the unit to have it discovered. Use your inverter date code listed on the side of the unit as the unit code.
  6. G

    Solar Roof Installation Tips

    Here is an intersection on my roof. They spent a lot of time getting this part done right.
  7. G

    No load center/electrical panel upgrade needed?

    I did look into the Leviton system. From my research it seems that most electricians are not in favor of this system as they prefer the more traditional proven panels. I think I may just stick with what will be provided then look into the Lumin product if I really think I want those features.
  8. G

    No load center/electrical panel upgrade needed?

    Thanks for the link, Jay. Looks like is does essentially the same thing as the Span panel using existing load centers.
  9. G

    No load center/electrical panel upgrade needed?

    Hi Brett. Thanks for your response and I agree with your guidance regarding the Span panel.
  10. G

    No load center/electrical panel upgrade needed?

    No, my solar roof install is scheduled for next month.
  11. G

    No load center/electrical panel upgrade needed?

    Dave was right that the inspector was there to take a bunch of pictures and it is up to the Tesla engineers to do the analysis to determine what is needed. He did say he thought the panel would be replaced but deferred that decision to the engineers. Really nice guy that took the time to...
  12. G

    No load center/electrical panel upgrade needed?

    Got it. Thanks!
  13. G

    No load center/electrical panel upgrade needed?

    I have that same panel and I have the on site inspection for my solar roof install tomorrow morning. I will let you know the results.