Our system is a split inverter system with 3.8kWh on system 1 and 4.5kWh on system 2. Installer configured both systems to be monitored on one input and it works fine. Our single pw2 can only charge at a max rate of 5kWh peak so some energy is not sent to the battery. That said there is plenty...