I have two PW2s with Gateway 2 and 6720 watt solar with SMA SunnyBoy 7000 inverter.
I was doing various power outage test scenarios by throwing the service disconnect and in most cases, the switchover to the PW2s was seamless save for flickering of some lights, my NAS server had no interruption...