Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Search results

  1. B

    Partial Home Backup and Powerwall delivery to non-protected loads

    Hi Folks, Including a photo of my electrical setup below. Tesla is going to install solar and 2 PWs on the 200A subpanel. However, I can't seem to get them to monitor non-protected loads going to my ADU that I would like to draw power from my Powerwalls during normal operation when connected to...
  2. B

    Potential design for 400A service with Tesla Solar, 2 Powerwalls, and 3 subpanels

    We are in Northern California and, after an 18-month timeline, PG&E is finally scheduled to change our transformer soon. This will allow us to upgrade our main panel from 200A to 400A (320CL). Thankfully no retrenching was needed and yes, load calculations showed that 200A wouldn't have been...
  3. B

    Should I get Powerwalls if I am on an essential "circuit/block"?

    I am in the Bay Area (PG&E) and have an order for a 9.6 kW solar + 2 PW in-progress. However, I recently discovered that I am in PG&E's special outage block #50. This means that I am "generally exempt from rotating outages" because "essential services such as hospitals and police and fire...