    Prefabricated supercharger stalls

    I know that Gordon does a lot of supercharger construction, but I have not yet seen many permits in New England using the prefab concrete base design. I think the sites under construction in Palmer (MA), Saco (ME) and Windham (ME) are using prefab but I don't think I've seen more than that...
  2. M

    Prefabricated supercharger stalls

    There's an awful lot of prefabricated supercharger equipment being staged/assembled in Voluntown, CT. There are numerous 4-stall assemblies using the precast concrete base, but there are also many in a 2-stall configuration (using one SC cabinet) mounted on what looks to be a painted steel...
  3. M

    Wiki Starlink equipped Superchargers

    Starlink is in operation at Lisbon, CT supercharger: https://teslamotorsclub.com/tmc/posts/6230155/
  4. M

    Supercharger - Lisbon, CT

    Starlink is back and in operation. I actually was able to see it searching for a signal (dish moving) at one point. Wifi connects automatically once you put it in park. I tested range and it seems to be about 100 ft. Speed test from in-car browser:
  5. M

    Supercharger - Lisbon, CT

    I can confirm it's operational... charged there yesterday.
  6. M

    Supercharger - Lisbon, CT

    The transformer is landed on its pad and the feeder cable is connected at utility pole with new fusing. There is a lock on the cosmetic enclosure doors now (so the metering/control cabinets inside might be allowed to be energized, though not necessarily). The charging posts are being installed...
  7. M

    Supercharger - Lisbon, CT

    They're making really good progress at this site. Pedestals for the charging posts are installed, metering/control cabinets are on site, pads are poured, and interconnecting conduits are installed. The most difficult portion of the 600ft conduit run to the feed transformer (including across...
  8. M

    Supercharger - Lisbon, CT

    Yes that's the spot
  9. M

    Supercharger - Lisbon, CT

    Construction started today! The crew said they'd be done by end of year. I plan to post regular updates on progress. This location has very easy access on/off I-395 N and S. Nearby Panera, Ruby Tuesday, and new pizza place are very easy walks. Chili's is across the street and less...
  10. M

    Supercharger - Lisbon, CT

    The Lisbon Landing location is still a go. They're just waiting on Eversource for approval of an easement.