Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Search results

  1. rayluis1988

    Supercharger - North Hollywood, CA (permit filed Jan 2022, 12 stalls)

    No signs of Tesla Equipment/Construction Yet. Mall/Charge Point installed so many Level 2 chargers all over the parking lot.
  2. rayluis1988

    Supercharger - Van Nuys, CA (under construction Feb 2024, 8 V3 stalls)

    Cabinets installed behind the gas station. Cables from the main line installed (LADWP moving quite fast- Good for once lol) Some pics taken while moving, excuse the bad quality.
  3. rayluis1988

    Supercharger - Sylmar, CA (permit, 24 stalls at La Rinda Plaza)

    Went by this location to check and there is NO sign of Tesla equipment yet (Permit issued on 04/18/2024). The LA side of the plaza (light purple circle) is by far the less busy side of the plaza and the side that lands on City of Los Angeles. (border line between City of San fernando and City of...
  4. rayluis1988

    Supercharger - Los Angeles, CA (permit, 48 stalls, Beverly Connection Mall)

    PC Info Completed/Plan Check Approved on 04/12/2024
  5. rayluis1988

    Supercharger - Sylmar, CA (permit, 24 stalls at La Rinda Plaza)

    Status changed to: PC Info Complete on 04/17/2024
  6. rayluis1988

    Supercharger - Hollywood, CA (under construction Sep 2023, 32 stalls + diner)

    Not even LOL, it is a huge project. They are still working on the main building. I drove by the other day. None of the stalls seemed to be installed yet. I could really focused on details because I was driving.
  7. rayluis1988

    Supercharger - San Diego, CA - Clairemont Mesa Blvd (LIVE 17 Apr 2024)

    Exactly lol. So many Teslas around and nobody saw a process which takes months.
  8. rayluis1988

    Supercharger - North Hollywood, CA (permit filed Jan 2022, 12 stalls)

    The trend lately is a hold, a long hold for utility/transformer/activation. Universal City and Chatsworth have been fully built for months now and just waiting to be turned on. And those two are in LADWP territory which NoHo is as well, so we might have a wait at the end too, unfortunately or if...
  9. rayluis1988

    Supercharger - Granada Hills, CA (LIVE 24 V3 stalls)

    Expansion now OPEN. Total of 24 V3 stalls now. @Guacahummus @Big Earl
  10. rayluis1988

    Supercharger - Okeechobee, FL (Yeehaw Junction)

    Yeah lol, but it is nothing new. Majority of reporters have no idea of what they are talking about when reporting on elctric cars and their tech.
  11. rayluis1988

    Supercharger - Okeechobee, FL (Yeehaw Junction)

    Cool that they even used supercharge.info map on the video.
  12. rayluis1988

    Supercharger - West Hollywood, CA (LIVE 2 Sep 2022, 8 V3 stalls)

    Absolutely right, a good friend of mine works for them and he always tells me: Dont mess with WEHO parking, they will get YA lol
  13. rayluis1988

    Supercharger - Sylmar, CA (permit, 24 stalls at La Rinda Plaza)

    Permit READY to be ISSUED-NICEE. Finally I start to see the valley getting so much needed coverage.
  14. rayluis1988

    Supercharger - Van Nuys, CA (under construction Feb 2024, 8 V3 stalls)

    Power cabinets are not visible anymore, I assume they are already installed in the back of the gas station. Brand New metal pole installed to feed the SC from the main electric line that passes on the other side of the street. This site is moving quite fast but always the hold up is at the...
  15. rayluis1988

    Supercharger - Los Angeles, CA - North Eagle Rock Blvd. (permit found, 60 stalls)

    I would suggest putting 60 (permit states that amount) and lets see if it gets modified later on when the permit moves towards approval.
  16. rayluis1988

    Supercharger - Los Angeles, CA - North Eagle Rock Blvd. (permit found, 60 stalls)

    That is an awesome evaluation you did. Lets see what Tesla does in this case. I would prefer use theat middle building for vending machines and bathrooms even if that means dropping the number of stalls a bit.
  17. rayluis1988

    Supercharger - Los Angeles, CA - North Eagle Rock Blvd. (permit found, 60 stalls)

    https://www.ladbsservices2.lacity.org/OnlineServices/PermitReport/PcisPermitDetail?id1=24041&id2=10000&id3=11080
  18. rayluis1988

    Supercharger - Granada Hills, CA (LIVE 24 V3 stalls)

    Permit FINALED yesterday/final inspection for the add on section (8 more V3 posts). Addition should be going live soon.
  19. rayluis1988

    Supercharger - Chatsworth, CA - N. De Soto Ave. (under construction, 8 V3 stalls)

    Transformer is already in place. Should and hopefully goes LIVE soon. It has been a long wait/hold up with this one.
  20. rayluis1988

    Supercharger - Van Nuys, CA (under construction Feb 2024, 8 V3 stalls)

    Posts already installed. Power Cabinets waiting to be installed.
  21. rayluis1988

    Supercharger - Granada Hills, CA (LIVE 24 V3 stalls)

    @Guacahummus @Big Earl @bmah Guys, can you chage the tittle on both Sc info and TMC? Now, only 16 V3 are LIVE. The 4 urban stalls were removed and 8 more V3 are under construction right next to the current ones. See permit above.
  22. rayluis1988

    Supercharger - Universal City, CA (under construction Dec 2023, 12 V3 stalls)

    Went by today and as far as SC equipment, everything is fully installed. Stalls are bagged which means that we are in for a long wait. All seems to be “transformer wait”. Looks like LADWP is in the same bag as PG&E and SDGE.
  23. rayluis1988

    Supercharger - Van Nuys, CA (under construction Feb 2024, 8 V3 stalls)

    Power Cabinets, other power equipment, stall boxes and conduit are already on site. Trenching appears to be done on the corner of the lot. Judging by the height of the stalls boxes, they appear to be V3. Went in the gas station to get a coffee and at the checkout, I tried to talk to the guy...
  24. rayluis1988

    Supercharger - Burbank, CA - E. Orange Grove Ave (site proposed, 28 V3 stalls)

    Same happened to me when I e-mail the guy running several permits for LADBS, he was all about interrogating me but he is known to be a little bit of a j**k. Yeah this parking lot gets crazy, I would not be surprised if the mall was the one that put a STOP on the project.
  25. rayluis1988

    Supercharger - North Hollywood, CA (permit filed Jan 2022, 12 stalls)

    Totally. There is a big gap in The San Fernando Valley coverage. And the permits in that gap area seem NOT to move at all. Happens with the one in SunValley (40 stalls) as well.
  26. rayluis1988

    Supercharger - North Hollywood, CA (permit filed Jan 2022, 12 stalls)

    One year today since the last movement on this permit.. SMH
  27. rayluis1988

    Supercharger - Van Nuys, CA (under construction Feb 2024, 8 V3 stalls)

    Fencing has gone up. No visible Tesla equipment visible but big container in the back of the gas station. It has to be the SC construction, permit was app at the beginning of January. On the permit page says that there is one inspection already schd for compliance. @Guacahummus @Big Earl
  28. rayluis1988

    Supercharger - Los Angeles, CA (permit, 48 stalls, Beverly Connection Mall)

    More corrections addressed on 02/01/2024-Verification in Progress.
  29. rayluis1988

    Supercharger - Van Nuys, CA (under construction Feb 2024, 8 V3 stalls)

    No sign of construction or equipment at this location which is a bit odd since permit was issued a month and 7 days ago.
  30. rayluis1988

    Supercharger - Granada Hills, CA (LIVE 24 V3 stalls)

    https://www.ladbsservices2.lacity.org/OnlineServices/PermitReport/PcisPermitDetail?id1=23020&id2=20000&id3=00518 I think this is it. They are adding 8 more posts/stalls
  31. rayluis1988

    Supercharger - Granada Hills, CA (LIVE 24 V3 stalls)

    There are power cabinets-8 posts? and looking at the spaced fanced off, it is 8 parking spots not counting where the little house is.
  32. rayluis1988

    Mexico Superchargers

    Absolutely. I drive my Model Y down to Ensenada often, but we are restrained due to the huge gap between Tijuana/Ensenada to Santa Ana and another gap between Santa Ana and Chihuahua.
  33. rayluis1988

    Mexico Superchargers

    I said the same lol. Central Mexico is filling up nicely.
  34. rayluis1988

    Supercharger - Chatsworth, CA - N. De Soto Ave. (under construction, 8 V3 stalls)

    This site has been all built up for months now. It s been quite a long hold, maybe transformer.