You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
El Paso Eastlake Supercharger construction has been going on for a while, no green transformer yet. Weird I didn’t see the electrical permits for this spot. 8 stalls in front of that Starbucks mentioned a while back.
Construction confirmed, tesla SC posts and other equipment are present.
The foundations are being built. No big huge transformer yet, but it is going up fast.
Electrical Permit was issued on the accela, construction soon?
https://aca-prod.accela.com/ELPASO/Cap/CapDetail.aspx?Module=Building&capID1=23B09&capID2=00000&capID3=06105&agencyCode=ELPASO
Anyone have the update for the Bonus Module that can share it?
I've tried several times to get an update from Ingenext but keep being met with silence.
Rechecked Google Maps, 2702 W Amador now shows on this small lot.
On said lot, there appears to be active construction. Passed by on multiple occasions to that lot empty.
I’ll let you guys decide if it warrants an orange cone on supercharge.info
Now it marks at 2702 W Amador, previously at 2701 W Amador.
Seems they moved it to either the TA Travel Center or the Pilot Travel Center
from the Border International Semi area.
2019 Model 3 LR/Boost
Cosmis Racing R1 19x8.5 on 255/35 Pilot Super Sport
Silvers Neomax AWD Adjustable Coilovers
Redwood Motorsports Front and rear Sway bar kit.
OEM Roof Rack with Yakima 46' Fairing.
I also have Ingenext Bonus Module and the Hansshow 10' Screen Dash.
The vacant lot you're referring to next to the Starbucks is the site of a future Chick Fil-A. The Starbucks parking is too small to accommodate the Supercharger.
It may end up just being in a parking space in the same Eastlake Marketplace.