Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

Search results

  1. R

    Is anyone interested in an Enhanced Autopilot Subscription?

    Also, I like to drive so prefer EAP over FSD until I’m really old!
  2. R

    Is anyone interested in an Enhanced Autopilot Subscription?

    I have a 2015 model S 85D and use it’s EAP for 80% of my driving (both in town and Highway, with limited summon and no auto Highway ramp). About to purchase new Model S and would much rather pay a subscription rather than add $6000.00 to the purchase price!
  3. R

    Charging Speed

    I agree with Rocky that this a problem with your car that requires repair!
  4. R

    Supercharging Speeds: Who, what, where, why, and when

    Is a class action suit appropriate like the one for range limitation?
  5. R

    Does it matter which supercharger I use on my 2017 Model S?

    I have. 2015 85D with 52,000 mi and the highest charge rate with low SOC of 40 mi or less is 100kw max. and reduces to 75 kw within 5 min and then gradually drops even with preconditioning. The SC checked out the charging system which they say is functioning as it should although Tesla says the...
  6. R

    Supercharger - Portage, MI

    Looks like all that is needed is for Tesla to test and place in service!
  7. R

    Supercharger - Portage, MI

    Just wanted me to stay outside of the temp. fence. I
  8. R

    Supercharger - Portage, MI

    New power pole placed and wires dropped to transformer. Final wiring being done and enclosure almost completed. Next week?
  9. R

    Supercharger - Portage, MI

    I’ll check again on Wednesday
  10. R

    Supercharger - Portage, MI

    Supplementing Big Earl images. Power pole was delivered and assume it will feed from the pole pictured, which is adjacent to a large power distribution center. Moving right along!
  11. R

    Supercharger - Portage, MI

    Getting ready to pour concrete
  12. R

    Supercharger - Portage, MI

    Yesterday the pedestals were installed but no slab for the superchargers and no wires run.
  13. R

    Supercharger - Portage, MI

    More progress with bases installed and copper ground wires ren
  14. R

    Supercharger - Portage, MI

    Some progress and bases delivered
  15. R

    Supercharger - Portage, MI

    Stopped by Meijers today and construction is well underway! It’s located in the parking lot north of the building not at the front of the parking lot like other locations. All conduit is installed for 8 stations and should be back filled early next week. Have photos but don’t know how to...
  16. R

    Supercharger - Portage, MI

    @MarcoRP, what issues?
  17. R

    Supercharger - Boonton, NJ

    Latest picture shows the station 3rd from the right doesn’t have a top cover.
  18. R

    Supercharger - Dickinson, ND

    Don’t get your hopes up too high! This is happening all over the US and been waiting in Michigan since before the end of Q2. I feel this is a true shortage
  19. R

    Auto steer Not ready for prime time

    I have an early 85D with AP and must say that the software updates have improved it significantly. I never have experienced a “wobble” with lane change as it always works well and veering while cresting a hill has been almost completely eliminated. Still experiencing “wandering “ in wide lanes...
  20. R

    Supercharger - Yuba City, CA

    I see a solar canopy on the last few pictures but not on the aerial views
  21. R

    Supercharger - Walker, MI

    Looks like there is already a transformer on site
  22. R

    New Superchargers Proposed in Greensboro and Raleigh, NC

    Hey there Buba, You sure know how to use them there English words,
  23. R

    Supercharger - Franklin Park, PA

    My bad! Just got up and didn't read carefully.
  24. R

    Supercharger - Franklin Park, PA

    Confused! Same construction picture for both Hermitage and Wexford.
  25. R

    Supercharger - Lansing, MI

    The Michelin Primacy run flat tires have ZP(zero pressure) after the tire size.
  26. R

    Supercharger — Traverse City, Michigan

    Called both TC zoning department and the county planning department and all permits have been picked up and paid for.
  27. R

    Supercharger — Traverse City, Michigan

    My brother in law just saw the permit in the TC paper!
  28. R

    Supercharger — Traverse City, Michigan

    Discovered that the area where the SC will be build is actually governed by the city of TC. Talked to the Zoning Administration and they said they have had contact but no permits have been pulled yet.
  29. R

    Supercharger - Myrtle Beach, SC

    @jelloslug if you look closely you'll see that the 2 end spots are "pull in forward " thus giving 10 superchargers
  30. R

    Supercharger — Traverse City, Michigan

    My brother in law checked yesterday and couldn't find any evidence of construction
  31. R

    Supercharger - Myrtle Beach, SC

    Should go fast as I noticed that the underground power cable conduits are already present just behind the excavator in the first picture. Refer to the January 5 photo.
  32. R

    Supercharger — Traverse City, Michigan

    Notice the 3 PVC pipes sticking up by the pole. Although I don't see any disturbed ground indicating trenching.
  33. R

    Supercharger — Traverse City, Michigan

    My brother in law drove through the entire parking lot and found nothing! Will check again in a week.
  34. R

    Supercharger — Traverse City, Michigan

    I emailed my brother in law to go check it out and sent pictures. We'll see
  35. R

    Supercharger — Traverse City, Michigan

    Is it under construction or just approved?
  36. R

    Supercharger - Moosic, PA

    @Lanny See above. Thanks for the feed back!
  37. R

    Supercharger - Moosic, PA

    @5YJSA Works for me!
  38. R

    Supercharger - Moosic, PA

    On road trips I call Tesla(while charging) to check if the next several SC are functional.
  39. R

    Supercharger - Myrtle Beach, SC

    We are supposed to stay at Marriott's OceanWatch Villas at Grand Dunes starting October 29 and were told they are closed and they won't answer the phone. Any input? Thanks
  40. R

    Supercharger - Augusta GA

    I enlarged the pictures and it looks like the conduit is already in for the charging units. I also wonder if the equipment pad has been poured(under the plastic).
  41. R

    Supercharger - Bay City, MI

    On my way to Custer SD for the cruise-in and talked to another owner who talked to someone from Tesla and they said "construction has started". Needs to be confirmed!
  42. R

    Supercharger - Cadillac, MI

    Word has it that the SC was tested yesterday and should now be open!
  43. R

    Supercharger - Seabrook, NH

    @TslaIsFuture, Will be returning from Acadia NP on this Saturday and would appreciate a "heads up" if Seabrook is online. Much better location than Hooksett. Charged here at Smugglers Den RV park(14-50) for $15.00 and also at destination charger at Newcastle Inn in Newcastle, ME for 2...
  44. R

    Supercharger - Plantation, FL

    The Sunday drive is indeed back! Forgot how fun it is!
  45. R

    Supercharger - Grand Rapids, MI

    I noticed they are on the 2016 map but Lansing an two others are on the 2015 map.