You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
NY, Nope. Although getting a CCW is a lot easier there than downstate. NY is "May issue", and getting a permit is up to the judge.
The chalk never touched their car, just the pavement
Looks like you’re going to have it out argue the counter ladies about where they can park now. Honestly, I’ll be shocked when more than two cars show up to charge. New chargers always go through this transition when prime parking goes away. In thousands of charges, I’ve never been iced out.
With the thinner cables and the top vented supercharger unit, I believe “Bighorn “ has this labeled correctly as a V3 Supercharger and this should have a Purple pin marking it.
Okay, glad to hear that it is not only open, but that it is a V3. I mis-identified it (granted I've been using superchargers for 2 years, I've only used V2 ones) and when I first reported on this I hadn't been able to charge. This is wonderful news. Thanks everyone
This is going to be very mice on my drives between Rochester and Plattsburgh. I’ll no longer have to charge to 90+ at Utica or take a detour through Queensbury.
Just parking over lines taking 2 spots, chargers or not is one of "Those things" for me. I used to carry a piece of construction chalk, would draw lines on both sides of the car, and write "A*****e Parking"
I saw a posting on FB today where an individual took a picture of the new chargers in Lake Placid. They are still under construction but apparently will be at the Price Chopper.