That is too bad.. There is a real need... Burbank has 3 stations that filll up often and then there is nothing in the valley bewteen Burbank and Sherman Oaks which is in a pay lot
Totally. There is a big gap in The San Fernando Valley coverage. And the permits in that gap area seem NOT to move at all. Happens with the one in SunValley (40 stalls) as well.
1708635081179.png
 
  • Like
Reactions: BigWaveDragon
How long does it take once the permit is in?? SInce these things seem to comne on cement blocks ready to drop in, I wouldn't think long once the power is ran and cabinets put.... NoHo needs a supercharger. Burbank has 4!
The trend lately is a hold, a long hold for utility/transformer/activation. Universal City and Chatsworth have been fully built for months now and just waiting to be turned on. And those two are in LADWP territory which NoHo is as well, so we might have a wait at the end too, unfortunately or if we ar lucky no.