Still tough digging at this site. They still haven’t made it from the transformer to the switchboard. No concrete poured yet. Not an easy site here
3ED41407-5B80-4B3F-BF9D-FB808C8F3E36.jpeg
6FBE839F-229D-430A-9A31-B4AE46ADBD76.jpeg
88E4DC37-E373-4371-8144-F0469EEF6447.jpeg
2CD83B24-7250-47AF-A324-46A3B9F7B295.jpeg
 
Mud hole on site today no workers. To my surprise they did the directional under the driveway and finished the underground service. This will be good for getting Dominion on site. CT cabinet has been delivered and should be install any day. Underground inspection must be done and there now backfilling trenches. No concrete yet but that’s next . They are over the hump.
CD183267-398B-464C-96AC-22D1CED96E53.jpeg
C1673360-CD88-4C62-8354-611A6C8BD9A7.jpeg
97EDFA4F-04BC-4F0D-B28A-E0A2C80C9C61.jpeg
 
LES is wrapped up with the electrical part. Now it’s site cleanup and Dominion Powers turn. No meter or Transformer yet.
Two spots are for charging only and the rest are 15 minute general parking. The parking lot always seems full at this site. I had to park next to the chargers because everything was full. Icing will be an issues here.

F155C57D-25BC-462B-8602-C7FEE14FCD4C.jpeg
B6039AD2-2E27-40BB-873A-9503704F0E6E.jpeg
F0F6AADA-E58E-4B3B-9DEB-6F0DB11965A2.jpeg
 