Welcome to Tesla Motors Club
Discuss Tesla's Model S, Model 3, Model X, Model Y, Cybertruck, Roadster and More.
Register

VIN ..... early or late build?

This site may earn commission on affiliate links.
My VIN ends in 6001 and it was manufactured 5/20, delivery on 5/29.
I have paint issues (10 or so places, most smaller than 1/8 inch and one about 1/2 an inch), mis-alignment of the hatch on one side, driver side mis-alignment of rear door to back of the body.
Taking it in for service on the 9th.
 
Mine is 5859 and it was manufactuerd 5/20 (May/ 2020), delivered 5/31. No issues.

I guess that still doesn't tell us if we were before or after the shutdown. Does anyone know the exact shutdown dates? If they shuttdown in April, would it imply we were built after the shutdown with a 5/20 date? I wish the build date was more specific with the exact date.
 
Mine is 5859 and it was manufactuerd 5/20 (May/ 2020), delivered 5/31. No issues.

I guess that still doesn't tell us if we were before or after the shutdown. Does anyone know the exact shutdown dates? If they shuttdown in April, would it imply we were built after the shutdown with a 5/20 date? I wish the build date was more specific with the exact date.
That's def post shut down, they were shut down ~officially~ until 5/18