My Gateway is inconsistent at what level it commands solar to start generating again.
I'm currently is a PSPS. Once the Powerwalls are full and solar has been commanded off, it appears my Gateway normally commands solar to start generating again when the Powerwalls are down to about 97%. I have 2 solar generating systems. One is Rule 21 compliant and the other is not. Today when the power was shutdown at a little after 3 pm (my Powerwalls were 100% full) the solar didn't start generating again until the Powerwalls were down to about 90%.
What are the specific frequency shift steps vs Powerwall charge level that the Gateway should be stepping to?
I'm currently is a PSPS. Once the Powerwalls are full and solar has been commanded off, it appears my Gateway normally commands solar to start generating again when the Powerwalls are down to about 97%. I have 2 solar generating systems. One is Rule 21 compliant and the other is not. Today when the power was shutdown at a little after 3 pm (my Powerwalls were 100% full) the solar didn't start generating again until the Powerwalls were down to about 90%.
What are the specific frequency shift steps vs Powerwall charge level that the Gateway should be stepping to?