I have had some issues with Tesla and I am re-submitting my application with PG&E for PTO for a 17kw system with 3 x power walls, install was completed in April 2022.
PGE ask for the following info for the Powerwall, I have no idea:
1. Generator Type: Invertor: External / Incorporated or Machine: synchronous / induction
2 Nameplate rating (kw)
3. Output voltage rating
4. Power factor
See attached screenshot, they are asking for lots of info, any help will be greatly appreciated or a sample application.