Michelx
Member
Are they more than 50kw ?According to the Petro Can website, the whole network is currently free...
EV Fast Charge car charging stations
You can install our site as a web app on your iOS device by utilizing the Add to Home Screen feature in Safari. Please see this thread for more details on this.
Note: This feature may not be available in some browsers.
Are they more than 50kw ?According to the Petro Can website, the whole network is currently free...
EV Fast Charge car charging stations
Are they more than 50kw ?
Their CCS are rated for 200 kwh, the Chademo are rated for 100 kwh. Unhappily, the Tesla adapter is limited as @RiverBrick stated.Are they more than 50kw ?
[USER=58354]@Vawlkus : the CCS have a rate of 350kw while the CHAdeMO have a rate of 100kw.
Location link
PlugShare - Find Electric Vehicle Charging Locations Near You[/USER]
Agreed. Doesn't matter that the pipe can provide 100 kw. The adapter is limited to 50 kw for all Teslas. Even if the site offered 1 Mw.
No, you can’t use both at the same time.I can’t remember if the cabinets are rated for 300 kWh, and if that gets split between the CCS and Chademo or something similar.
Sorry, meant CCS on one and Chademo on the other. The two stations share the input cabinet feeds.No, you can’t use both at the same time.
Yea! The new closest Petro Canada fast charger to me, in Les Cèdres Quebec!
According to the Petro Can website, the whole network is currently free...
EV Fast Charge car charging stations
Do they have plans for a website to check ahead on status (in use, out of service, etc)?Passed by the Petro-Canada in Les Cèdres Quebec. Was a bit of a pain to get there as I was on east bound 20 hwy and did not expect to see the overpass completely removed thus removing easy access. Slight detour and found my way there only to find out both FAST DC charger stations were not operational.
Do they have plans for a website to check ahead on status (in use, out of service, etc)?
Showed up today mid afternoon. No one was there charging. Both duel stations were operational and free to use. I went there with my SR+ at 40% SOC. I was getting 45 kW and Charging station was reporting 48 kW. Took about 20 minutes to get to my cutoff of 85% SOC. Had plenty of time to get some redbulls and bathroom break before heading north to cottage country.Petro-Canada is testing their DCFCs in Les Cèdres on September 13th in the afternoon. For those interested in testing the charger, contact Petro via PlugShare.View attachment 453429