Anyone have any information on this that is different from their web page?
I emailed them to even see if the program is still in place. Right now I have a permit to put in another 100 amp panel and meter so I can go on a dedicated EV plan and not interfere with my house (E7 ==> E6) NEM.
I emailed them to even see if the program is still in place. Right now I have a permit to put in another 100 amp panel and meter so I can go on a dedicated EV plan and not interfere with my house (E7 ==> E6) NEM.