Anyone else run into this with their Powerwall installation?
I have the following configuration:
3 x PW2 in whole-house backup configuration
12 kWh SunPower Solar System
The PW installation was completed 2 months ago, and we have been live with no problems since.
I get a call from Tesla today stating that SDG&E wants a solar disconnect installed and a SECOND meter. This doesn't make any sense to me because:
1) we already have a solar disconnect on the system (what would be the point for a second one)
2) I never agreed to any kind of secondary metering
We are in Step 2 of Large-Scale Storage SGIP, which could be the only reason I could think for this.
Anyone else have any kind of similar experience with the utility requiring an additional disconnect and a second meter?
I have the following configuration:
3 x PW2 in whole-house backup configuration
12 kWh SunPower Solar System
The PW installation was completed 2 months ago, and we have been live with no problems since.
I get a call from Tesla today stating that SDG&E wants a solar disconnect installed and a SECOND meter. This doesn't make any sense to me because:
1) we already have a solar disconnect on the system (what would be the point for a second one)
2) I never agreed to any kind of secondary metering
We are in Step 2 of Large-Scale Storage SGIP, which could be the only reason I could think for this.
Anyone else have any kind of similar experience with the utility requiring an additional disconnect and a second meter?