C CanadaGoose abcdef Dec 26, 2019 1,023 1,542 Ottawa, ON Oct 6, 2022 #1 Oct 6, 2022 #1 25 Peel Centre Drive Brampton, ON L6T 3R5 Last edited: Oct 6, 2022 Reactions: menaknow, Mayoo and Tony_YYZ
Mayoo Member Jan 4, 2018 505 484 Caledon Dec 6, 2022 #3 Dec 6, 2022 #3 This mall parking lot is huge so did two rounds of scouting. So far no signs of SC construction
C CanadaGoose abcdef Dec 26, 2019 1,023 1,542 Ottawa, ON Dec 9, 2022 #4 Dec 9, 2022 #4 Mayoo said: This mall parking lot is huge so did two rounds of scouting. So far no signs of SC construction Click to expand... It's not happening. There was a permit for the other location. This location is not in the same permit system.
Mayoo said: This mall parking lot is huge so did two rounds of scouting. So far no signs of SC construction Click to expand... It's not happening. There was a permit for the other location. This location is not in the same permit system.