No construction or other activity yet as of Sept 1, 2023. The best thing about the location is proximity to Cracker Barrel, but there is barrier of unmaintained vegetation, with a small ditch between the location and the restaurant. The closest easily accessible business is Hobby Lobby. WalMart is a bit of a hike. If you are thinking about using this location, there are some destination chargers just a mile up the road at "The Avenues", with plenty of dining options.
This site is now under construction (Dec 20, 2023). I have attached photos of the work, plus one showing the terrain between the supercharger site and Cracker Barrel. Cracker Barrel could solve most of that by mowing.
Feb 2024 update: A transformer is now installed. Conduits are in place for the Superchargers. I don't quite know why there is a post (conduit) at the front and back of each stall. Maybe that has something to do with charging of non-Tesla vehicles?
I think the make-ready is for two rows of chargers. On photo IMG_0032, the left-hand make-ready is for pull-in stalls, and the make-ready on the right side will feed the parking spaces that are slightly covered up by the installation equipment....
Yep. Verified open and charging is in progress! The cardboard boxes are labelled as bollards. It's been open three days and the trash cans are already full. It looked like some people were having trouble finding the chargers. If you navigate to Hobby Lobby, that will get you close.